background image

W W W . T M G I N D U S T R I A L . C O M

P 2 / 1 6

T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9

the building surroundings clear at all times

TMG-ST2030 Part List

Parts

code

Graphical

Description

Qty

BOX

1

Peak arch tube

7

1/1

2

Upper rafter tube

(middle truss)

10

1/1

2A

Upper rafter tube

(front truss)

2

1/1

2B

Upper rafter tube

(rear truss)

2

1/1

3

Shoulder tube

(middle truss)

10

1/1

3A

Shoulder tube

(front and rear truss)

4

1/1

4

Sidewall tube

14

1/1

5

Roof purlin

(horizontal tube)

54

1/1

5L

Left corner baseplate

(front and rear truss)

2

1/1

5R

Right corner baseplate

(front and rear truss)

2

1/1

Содержание ST2030

Страница 1: ...W W W T M G I N D U S T R I A L C O M P 0 1 6 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 gui ...

Страница 2: ...uring installation including parts We are not responsible for any damages or injuries caused by inappropriate installation unauthorized modifications or extreme weather This building is not intended for human occupancy It is recommended to tape or add foam rubber on the frame where joints connect and where it touches the cover This will help extend the life span of the cover Read the following ite...

Страница 3: ...BOX 1 Peak arch tube 7 1 1 2 Upper rafter tube middle truss 10 1 1 2A Upper rafter tube front truss 2 1 1 2B Upper rafter tube rear truss 2 1 1 3 Shoulder tube middle truss 10 1 1 3A Shoulder tube front and rear truss 4 1 1 4 Sidewall tube 14 1 1 5 Roof purlin horizontal tube 54 1 1 5L Left corner baseplate front and rear truss 2 1 1 5R Right corner baseplate front and rear truss 2 1 1 ...

Страница 4: ... 10 1 1 7A Ratchet 14 1 1 8 Door frame lower tube front and rear truss 5 1 1 9 Door frame upper tube front and rear truss 4 1 1 9A Rear frame middle tube 1 1 1 10 Door frame horizontal tube front and rear truss 4 1 1 10A Door frame horizontal tube rear truss 2 1 1 11 Ceiling cross bar 6 1 1 11A Two wheel rope pulley pre installed on 2A 1 1 1 11B One wheel rope pulley pre installed on 2A 1 1 1 ...

Страница 5: ... 1 1 13 Diagonal bracing bar 1st and last span 4 1 1 13A Tube clamp 8 1 1 14 Top cover tension tube for both bottom sides 2 groups 1 1 15 Door dropping tube 1 groups 1 1 16 Expansion bolt M12x100mm not included 52 1 1 17 Half round head bolt M10x80mm 63 1 1 18 Hex Bolt M10x70mm 126 1 1 18A Hex Bolt M8x80mm 6 1 1 19 Hex Bolt M10x30mm 20 1 1 19A Hex Bolt M10x50mm 8 1 1 ...

Страница 6: ... 1 6 T o l l F r e e 1 8 7 7 7 6 1 2 8 1 9 20 Nylon rope 2 1 1 21 Water plug 18 1 1 22 Top cover 1 1 1 23 Front cover panel 1 1 1 23A Rear cover panel 1 1 1 24 Braided rope 1 bundle 1 1 25 Ratchet straps 14 1 1 26 Scratch resistant tape 2 1 1 ...

Страница 7: ...baseplates must be installed firmly with expansion bolts 16 on this step Picture 1 Parts used in this step 4 Baseplates 5L 5R 10 Baseplates 7 2 Baseplates 6 52 Expansion bolts M16 16 3 Baseplates 6A Picture 1 Step 2 Assemble all trusses The building includes 7 trusses 1 front truss 1 rear truss and 5 middle trusses The front and the rear truss are to install with the fabric panel 23 and 23A Parts ...

Страница 8: ...wall tube 4 1 Ceiling cross bar 11 2 Hex bolt 19 12 Hex bolt 18 1 Two wheel rope pulley 11A 1 One wheel rope pulley 11B Picture 2 Parts used to install the rear truss in this step refer to Picture 3 1 Peak arch tube 1 2 Upper rafter tube 2B 2 Shoulder tube 3A 2 Sidewall tube 4 12 Hex bolt 18 ...

Страница 9: ...dle trusses in this step refer to Picture 4 1x5 Peak arch tube 1 2x5 Upper rafter tube 2 2x5 Shoulder tube 3 2x5 Sidewall tube 4 1x5 Ceiling cross bar 11 2x5 Hex bolt 19 12x5 Hex bolt 18 Picture 4 Lay down all 7 trusses on the ground as picture 5 when the assembly is all completed and before moving to next step Picture 5 ...

Страница 10: ...nd 3 to 5 people to pull the truss up from different directions When the truss is up tie the ropes to the heavy objects to make sure the truss will stay upright and use bolt 18 to connect the truss to the baseplate on both sides Picture 6 Parts used in this step 4 Half round head bolt 18 Picture 6 Step 4 Put up the rest trusses Refer to step 3 to put up the rest trusses connect all purlins 5 with ...

Страница 11: ...Step 5 Install the diagonal bracing bars 13 Connect diagonal bracing bar 13 on the first and last span between the shoulder tube and sidewall tube 3A and 4 with tube clamp 13A use bolt 19A Picture 8 Parts used in this step 2x2 Diagonal bracing bars 13 4x2 Tube clamps 13A 4x2 Hex bolt 19A Picture 8 ...

Страница 12: ... Door frame horizontal tube 10 2 Bottom tension bar 12 8 Hex bolt 18 4 Hex bolt 19 Picture 9 Step 7 Install the remaining parts on the rear truss Picture 10 Parts used in this step 2 Door frame upper tube 9 1 Door frame middle tube 9A 3 Door frame lower tube 8 2 Door frame lower horizontal tube 10 2 Door frame upper horizontal tube 10A 2 Bottom tension bar 12 2 Bottom tension bar 12A 6 Hex bolt 18...

Страница 13: ... bottom groove pocket on the door cover Tie two ropes 20 separately on both sides of the peak arch tube Pull both ropes under through the bottom of the door cover from the back then go up from front and through both pulley 11A and 11B Picture 11 12 The rope coming out from pulley 11B must go through the upper wheel of pully 11A then pull both ropes together slowly and start to lift the door cover ...

Страница 14: ... 1 2 8 1 9 Picture 11 view from inside Picture 12 view from outside Step 9 Install rear cover panel Use rope 24 to lift up the rear cover 23A from the center grommet and tie it firmly to the truss tube and spread toward both sides through each grommet along the tube Picture 13 ...

Страница 15: ...22 Do not install the cover during windy weather Unpack the top cover and place it along one of the long sides of the structure Use 3 to 5 ropes 24 to pull the cover over the top of the structure 2 or 3 people standing inside on ladders to push upwards will help to move the cover smooth without any damage Picture 14 Picture 14 ...

Страница 16: ...t the rope as needed Pull and stretch the cover enough only to take wrinkles out Repeat for the rear truss Do not over stretch as it could rip off the grommets Picture 15 Picture 15 view from outside Step 12 Tension the cover on the structure from both sides Picture 16 Insert tension tubes 14 slowly into the bottom groove pocket on both long sides Add the water plug 21 on the first tension tube to...

Страница 17: ... and nuts as well as all connection points to make sure they are all in good position Check the base plates adjust the ropes and tie downs if required and clean the cover regularly Snow accumulating on the fabric cover must be removed as soon as possible If snow becomes solid ice on the cover it will increase the weight on the roof and may collapse the shelter or reduce the life span Keep the shel...

Отзывы:

Похожие инструкции для ST2030