#4 – CARRIAGE ASSEMBLY
1.Place a moving blanket on the shipping pallet that the sawmill crate was strapped to. The blanket will
prevent the blade guard covers from becoming scratched. Using a
minimum of two people
or a
mechanical advantage system, remove the head assembly from the sawmill crate and place face down
on the blanket. The head assembly is very heavy, proper technique must be used to avoid injury or
damage.
2.Lay the above carriage pieces out.
3.Then Insert vertical post assemblies into corresponding locations in head assembly.
WWW.TMGINDUSTRIAL.COM
P12/43
Toll Free:1-877-761-2819
Содержание Kohler TMG-PSM26
Страница 35: ...DIAGRAM ENSEMBLE A B C WWW TMGINDUSTRIAL COM P35 43 Toll Free 1 877 761 2819...
Страница 36: ...DIAGRAM A BANDWHEEL HOUSEING WWW TMGINDUSTRIAL COM P36 43 Toll Free 1 877 761 2819...
Страница 39: ...PARTS LIST B CARRIAGE WWW TMGINDUSTRIAL COM P39 43 Toll Free 1 877 761 2819...
Страница 42: ...DIAGRAM C GUIDE RAIL WWW TMGINDUSTRIAL COM P42 43 Toll Free 1 877 761 2819...