![TMG GSG9 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/tmg/gsg9/gsg9_product-manual_1121815011.webp)
4. Installation Upper handrail assembly
Parts no.
Description
Specifications
Quantity
21
Brake line
1
44
Handle bar lock lever
1
59
Ratchet fixing bolt
M16*360
1
96
Machine body assembly
1
97
Upper handrail assembly
1
98
Throttle cable assembly
1
5. Installation brake cable
1. Install brake cable. Remove front jam nut and insert cable stop into brake lever.
2. Once inserted, pull cable back and insert into cable mount. Thread outer nut back on leaving about
15mm of thread showing. Using 13mm wrench tighten both jam nuts.
3. Fine tuning can be done with the knob on the end of the brake handle. Turing the knob clockwise
will increase tension. Counter-clockwise will release tension.
W W W . T M G I N D U S T R I A L . C O M
P 1 1 / 2 2
T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9