Ground
Ground
Ground
― 8 ―
English
Allowable Inclination
SH3NL / SH5NL / SH6NL / SSH5NH / SH6NH
SH5VL
1. Before installation, be sure to remove all protective seals.
2. Install the trap within the allowable inclination, as shown below. Also make sure that the
arrow mark on the body corresponds with the direction of flow.
3. Before installing the trap, blow out the inlet piping to remove all dirt and oil.
4. Install the trap in the lowest part of the pipeline or equipment so the condensate
flows naturally downward into the trap by gravity. The inlet pipe should be as short
and have as few bends as possible.
5. Support the pipes properly within 0.8 meters (2.5 ft.) on either side of the trap.
6. Install a bypass valve to discharge condensate, and inlet and outlet valves to
isolate the trap in the event of trap failure or when performing maintenance.
7. Install a check valve at the trap outlet whenever more than one trap is connected to
the condensate collection pipeline.
8. We recommend unions to facilitate connection and disconnection of the screwed version.
4. Proper Installation
• Installation, inspection, maintenance, repairs, disassembly, adjustment
and valve opening/closing should be carried out only by trained
maintenance personnel.
• Take measures to prevent people from coming into direct contact with
product outlets.
• Use hoisting equipment for heavy objects.
• Install for use under conditions in which no freeze-up will occur.
• Install for use under conditions in which no water hammer will occur.
CAUTION
Screen Holder
Arrow
Reference Level
Direction of
Inlet Flow
The face of the screen holder perpendicular to the ground, and the
inlet and outlet horizontal to the ground.
IMPORTANT! (For screwed connection)
To prevent rotation due to vibration,
secure trap in position by supporting
the body at the point marked
▲
Nameplate Face
Center of Piping
Perpendicular
Parallel
5˚
5˚
5˚
5˚
5˚
5˚
Direction of
Inlet Flow
From Top
Ground
Ground
Ground