172-65450MA-06 (JH5SL-P/JH5SH-P) 8 Nov 2021
17
Options
The options shown below are available for this product
on request. Please compare with the product you
received.
Options for Area A
(standard: without drain plug)
With Drain Plug
Options for Area B
(standard: with cover plug)
A pressure-balancing line connector can be attached to the place where the
standard product has the cover plug.
Socket Type
(Model: JH5SL-W, JH5SH-W)
Flange Type
(Model: JH5SL-F, JH5SH-F)
In principle, steam traps automatically discharge inflowing condensate. However, if
low-temperature condensate in the piping blocks the trap inlet passage,
displacement inside the piping of steam by condensate is obstructed and
condensate can no longer flow into the trap (steam-locking). Traps only function in
the presence of condensate inflow. A pressure-balancing line prevents the
occurrence of steam-locking.
Install the pressure-balancing line in the following manner:
Example: Heat Exchanger
Attach the pressure-balancing line
to the trap and to either the equipment
or to an area with a steam space.
Torque
N
m (lbf·ft)
Distance
Across Flats
mm (in)
35 (26)
21
(
13
/
16
)
(
1N
・
m
≒
10kg
・
cm
)
Steam
Pressure-balancing Line