background image

 

Your new lift will provide years of dependable service if installed, operated and maintained 
properly.  

Read and be prepared to follow all safety, installation, 

operation, and maintenance instructions in this manual before 

installing and operating the lift.  In addition, read and follow all safety 

and other information included on and with the lift be fore operating 

the lift.   Keep this manual in a secure place for future reference, 

training and service part identification. 

 

 
 

                                         TABLE  of  CONTENTS 

 

 

1.  Unloading Procedure and Lift Package Contents

      

                                page 3 

 

2.  Warranty and Safety

         

                                                                    page 4 - 6 

 

3.  General Requirements and Lift Specifications

        

                                   page 7 

 

4.  Pre Installation Procedures and Tools Required                                       page 8 

 

5.  Installation Procedures                                                                         page 9 - 11 

 

6.  Operating Instructions and Lift Maintenance                                           page 12 - 13 

 

7.  Troubleshooting                                                                                  page 14 

 

8.  Lift Installation Diagrams and Parts Lists                                                page 15 - 29 
 

 

IMPORTANT 

:

  It is the shop owner's responsibility to provide a satisfactory installation 

area for the lift.  Lift should only be installed on level concrete floors with a minimum of 4 
inches (102mm) and 3000 psi (20.7MPa) concrete that has been aged a minimum of 30 
days.  Please consult a qualified individual if any doubt exists concerning proper installation 

and subsequent safe operation of the lift.  Do not install the lift on asphalt or outdoors. 

 

Prior to installation, it is the shop owner's responsibility to provide constant electrical power 
in the correct voltage, phase, etc., and all wiring for electrical hook-up of the lift.  The shop 
owner must insure that the electrical installation conforms to local building and safety codes.  
Where required, the shop owner will provide an electrical isolation switch located in close 

proximity to the lift.  This switch will have an emergency stop capability and isolate electrical 
power from the lift for servicing requirements. 

 

Hydraulic oil cannot be shipped with the lift and will be supplied by either the shop owner or 
the installer.  ISO 32 hydraulic oil (10W non detergent hydraulic oil) must be used to fill the 
reservoir tank before operating the lift.  Grout for lift leveling must also be purchased locally.  

 

It is the shop owner's responsibility to train all operators in 

lift operation and lift safety. 

Содержание TLSS16ALORR1

Страница 1: ...SCISSOR LIFT Model TLSS16ALORR1 READ the Manual T horoughly Before Installing Operating Servicing or Maintaining the Lift SAVE this MANUAL and ALL INSTRUCTIONS Total Automotive Lifting Solutions Inc 2...

Страница 2: ...vel concrete floors with a minimum of 4 inches 102mm and 3000 psi 20 7MPa concrete that has been aged a minimum of 30 days Please consult a qualified individual if any doubt exists concerning proper i...

Страница 3: ...ory and Hardware Box see list below Optional Accessories included only if ordered Rolling Air Hydraulic Jacks 1 jack per box c w coiled air line Turnplates 1 turnplate per box c w retainer brackets Ac...

Страница 4: ...s the right to change specifications designs or add improvements to its product line without incurring any obligation to make such changes to products sold previously IMPORTANT SAFETY INSTRUCTIONS Whe...

Страница 5: ...plates and turn plates have all lock mechanisms securely in position Also insure that the lift and lift area is clear of all debris and that all oil and grease has been cleaned from runway surfaces 6...

Страница 6: ...on daily with all lift operators LIFT SAFETY and LIFT MAINTENANCE MUST BE PART OF YOUR DAILY ROUTINE IMPORTANT Insure Safety Instruction Decals and Hang Card are affixed to the lift console or operato...

Страница 7: ...provements may change specifications listed in this manual without notice Lift should only be installed on level concrete floors with a minimum of 4 inches 102mm and 3000 psi 20 7MPa concrete that has...

Страница 8: ...for IMPORTANT DO NOT CUT THE SHIPPING STRAPS HOLDING EACH RUNWAY ASSEMBLY TOGETHER UNTIL INSTRUCTED TO DO SO step 3 page 9 1 Identify bay center line near the front and mark the floor Also mark the c...

Страница 9: ...stallation process pages 14 28 Use these diagrams and parts lists together with the following written instructions Insure the lift installation complies with ANSI ALI ALIS Safety Requirements for Inst...

Страница 10: ...ft 10 Press the UP button and raise the lift 18 inches from the floor Press the DOWN button and lower the lift down to the floor Check hydraulic oil level in operator console reservoir and top up if r...

Страница 11: ...2 Connect the three wires in each cable as follows both Red wires to Pin 19 the White Wire from runway 1 to Pin 22 the White wire from runway 2 to Pin 21 both Black wires to Pin 20 17 Install both fro...

Страница 12: ...er the lift when raising or lowering Always insure mechanical safety locks are completely engaged on both sides of the lift before proceeding under the lift or a vehicle Lift operating controls are lo...

Страница 13: ...on Inspection and Maintenance ALOIM guidelines EVERY TWO YEARS Change and replace hydraulic oil in cylinders and console reservoir Lubrication Specifications where grease is required use a multi purpo...

Страница 14: ...ulty lowering solenoid valve 2 Obstruction under lift or in roller tracks 1 Replace valve 2 Carefully remove obstruction Lift Will Not Hold Pressure 1 Contamination in system 2 Internal Cylinder leaks...

Страница 15: ...rt reference SAVE this MANUAL and ALL INSTRUCTIONS Part Number D SLSM 14 Issue 0 13 E ective December 15 2010 Supersedes Issue 0 12 April 15 200 9 Total Automotive Lifting Solutions Inc 2300 Speers Rd...

Страница 16: ...re these lift diagrams and parts lists are kept in a secure place for quick reference Diagram Number Diagram Description includes Part List Page Number 1 Operator Console Locations 17 2 Main Component...

Страница 17: ...17 Diagram 1 OPERATOR CONSOLE LOCATIONS...

Страница 18: ...5 41140033 Main Hydraulic Cylinder 1 6 21140006 Main Cylinder Rod Weldment 1 7 41140021 Safety Locking Claw System 1 8 41140032 Top Support Slider 1 9 41140005 Deck Assembly 1 10 41140015 Wheelstop As...

Страница 19: ...24 14 31140051 ID 1 5 x OD 1 75 x 1 1 8 LG BRONZE BUSHING OIL 4 15 21140026 ROLLER 1 5 DIA PIN ASSEMBLY BOTTOM TOP 4 16 3C140029 5 16 SPRING WASHER LW 0 3125 4 17 3C140035 5 16 NC x 1 BOLT 4 18 11140...

Страница 20: ...er 2 2 41140011 Assist Cylinder 2 3 11140033 Main Cylinder Mounting Pin 2 4 31140013 GF 641 Hydraulic Grease Fitting 1 4 20 UNC 10 5 3C140039 1 x 3 5 L Hex Bolt 2 6 3C140031 1 2 Spring Lock Washer 4 7...

Страница 21: ...y Tube For 1 8 Oil Return Fitting 2 18 3C140049 Ext Clip Ring For 1 1 4 DIA Shaft 4 19 11140034 Center Hinge Pin 4 20 31140012 1 4 DIA x 2 1 2 L Spring Pin slotted SPS 0 25x2 5 4 Diagram 5 CONSOLE HYD...

Страница 22: ...22 Diagram 5 CONSOLE HYDRAULIC CONNECTIONS...

Страница 23: ...AT WASH 1 3 31140023 3 8 SWIVEL ELBOW CAMOZZI 6520 06 4 2 4 31140018 5 32 POLY TUBE FOR BREATH 1 8 ELBOW FITING 10 Long 2 5 31140021 NYLON 3 8 COILED HOSE N14 12B 3 6 31140028 3 8 BLACK POLYURETHANE T...

Страница 24: ...24 Diagram 7a LOW VOLTAGE CONSOLE CONNECTIONS TOP VIEW 1 PHASE Diagram 7b LOW VOLTAGE CONSOLE CONNECTIONS TOP VIEW 3 PHASE...

Страница 25: ...IFOLD 1 7 61140024 3 8 HYDRAULIC HOSE 21 LENGTH Link PUMP and MANIFOLD 1 8 61140021 HYDRAULIC DRIVE MOTOR 3HP LEESON 1 9 31140047 FLOW RETURN INLET 5 32 POLYURETHANE TUBING WITH FITTINGS 2 10 31140024...

Страница 26: ...26 Diagram 8 CONSOLE COMPONENTS AND CONNECTIONS...

Страница 27: ...9 LEVELING PROCEDURE Example 2 leveling start point if highest point on both base frames is here 6 7 9 3 5 2 1 4 8 Example 1 leveling start point if highest point on both base frames is here 6 7 9 3...

Страница 28: ...4 5 3C140048 EXT Clip Ring For 3 4 DIA Shaft 4 6 11140126 Roller 4 Diagram 10 WHEEL STOP and REAR APPROACH RAMP INSTALLATION PARTS LIST Front Wheel Stops PARTS LIST Rear Approach Ramps Item Part Numbe...

Страница 29: ...29 Diagram 11 SAFETY DECAL APPLICATION LIFT SAFETY and LIFT MAINTENANCE MUST BE PART OF YOUR DAILY ROUTINE...

Страница 30: ...30 The above information will assist you with purchasing grout material from a local source The grout material you purchase should meet or exceed these specifications...

Отзывы: