2
Your new lift will provide years of dependable service if installed, operated and maintained
properly.
Follow all safety, installation, operation, and maintenance
instructions in this manual before installing and operating the lift. In
addition, follow all safety and other information included on and with
the lift before operating the lift. Keep this manual in a secure place
for future reference, training and service part identification.
TABLE of CONTENTS
1. Unloading Procedure and Lift Package Contents page 3
2. Warranty and Safety page 4
3. General Requirements and Lift Specifications page 7
4. Tools Required and Pre Installation Procedures page 8
5. Installation Procedures page 10
6. Operating Instructions and Lift Maintenance page 13
7. Troubleshooting page 18
8. Lift Installation Diagrams and Parts Lists page 20
IMPORTANT
:
It is the shop owner's responsibility
to provide a satisfactory
installation area for the lift. Lift should only be installed on level concrete floors with no more
than 3
º
of slope and with a minimum of 4 inches (102mm) and 3000 psi (20.7MPa) concrete
that has been aged a minimum of 30 days. Please consult a qualified individual if any doubt
exists concerning proper installation and subsequent safe operation of the lift. Do not install
the lift on asphalt or outdoors. Failure to comply with these minimum standards could result
in personal injury or death.
Prior to installation,
it is the shop owner's responsibility
to provide constant electrical
power in the correct voltage, phase, etc., and all wiring for electrical hook-up of the lift. The
shop owner must insure that the electrical installation conforms to local building and safety
codes. Where required, the shop owner will provide an electrical isolation switch located in
close proximity to the lift. This switch will have an emergency stop capability and isolate
electrical power from the lift for servicing requirements.
It is the shop owner's responsibility
to
provide necessary lockout/tagout means for
energy sources per ANSI Z244.1-1982 (R1993), Safety Requirements for the Lockout/Tagout
of Energy Sources, before beginning any lift repairs.
Hydraulic oil cannot be shipped with the lift and will be supplied by either the shop owner or
the installer. ISO 32 hydraulic oil (10W non detergent hydraulic oil) must be used to fill the
reservoir tank before operating the lift.
It is the shop owner's responsibility to train all operators in
lift operation and lift safety.
Содержание TLS430FDCEx1 Series
Страница 23: ...23 Diagram 2 Front Crossmember...
Страница 25: ...25 Diagram 3 Rear Crossmember...
Страница 29: ...29 Diagram 6 Lifting Cable Routing...
Страница 32: ...32 Diagram 8 Anchor Bolt Installation...
Страница 33: ...33 Diagram 9 Driver Side Runway Assembly...
Страница 41: ...41 Diagram 17 Power Unit Wiring Diagram...
Страница 42: ...42 Diagram 18 Lubrication Locations...
Страница 43: ...43 Diagram 19 Safety Instructions...