![TKR Group PG 5-8 Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/tkr-group/pg-5-8/pg-5-8_owners-manual_1121125028.webp)
4.9.1
4.9.3
4.9.2
28
28
Fig. 4.9.1
After each working procedure the 3-way
ball valve must be moved to the „Relieve“
position.
Fig. 4.9.2
The compressed air supply line can be
disconnected if no pressure is being indi-
cated on the pressure gauge.
Fig. 4.9.3
Remove cover of blasting device and re-
move remainder of granules.
The granules must always be stored
in a dry place!
4.9 Taking the device out of service
Содержание PG 5-8
Страница 21: ...4 3 10 4 3 9 4 3 1 1 21...