![TKR Group 81 29 2 208 034 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/tkr-group/81-29-2-208-034/81-29-2-208-034_translation-of-the-original-instructions_1121117031.webp)
31
5.1.1
5.1.2
5.1.3
5.1
Maintenance / cleaning
Attention!
The blasting material hose
is also subject to wear dur-
ing operation, and must be
checked for damage at least
every two months.
The blasting material hose
should be replaced once per
annum if the device is used
regularly!
Fig. 5.1.1
Remove hose with protective braiding from
hose package.
Fig. 5.1.2 - 5.1.3
Detach hose clamps from grommet on con-
trol valve and handle.