Before you continue
Prior to installation and operation, carefully read all instructions in this manual and
heed all warnings.
Unpack this equipment and handle it carefully. If the package appears to be
damaged, notify the shipper immediately.
Use the original packaging to transport the unit. Disconnect power supply before
moving it. In case of returning the equipment, the original packaging must be
used.
Any change performed on the unit that is not previously approved by the
manufacturer will void both the certification and the warranty.
This equipment has been designed to fit in harsh environments requiring little or
no maintenance. Suggested inspection interval is 6 months, but extremely harsh
environments may require more frequent inspection and maintenance checks. On
each inspection check the O-ring seals and the eventual window wiper blade
integrity. Replace them if necessary.
Make sure that the installation surface can support at least four times the weight of
the unit in normal operating conditions. In case of excessive external stress (e.g.
vibration, strong winds or impact), the equipment may need additional means of
protection.
Clean the surface of product with a damp cotton cloth.
To maintain the IP rating of the unit, adequate cable glands must be used. The
unit must be tightly closed when operating.
Open only the covers pointed out in this installation manual. Other covers should
be open only by the manufacturer.
For security reasons, install the unit out of the reach of children.
For security reasons, do not install the unit in the proximity of water containers and
never push objects or pour liquids into the unit. The unit can be safely used in
damp environments or outdoors, as long as the glands or connectors are properly
sealed.
After the installation of the unit, the desiccant bag must be placed inside the unit,
assuring it won't be damaged by rotating and moving parts
All the electrical connections should be realized in a non-explosive atmosphere.
Before performing any operation, turn off the power. The installation of the unit
can be performed only by qualified personnel in accordance with the relevant code
of practice (e.g., EN60079-14) and with all the relevant local and national
standards including but not limited to the use of special pipes, tapes, sealants,
cables and glands.
When leaving the unit unused for long periods, disconnect supply cables.
Ensure that the unit case is properly earthed, connecting all the earth ground
studs. Earth cable should be about 10mm longer than the other cables on the
connector, in such way that it won't be accidentally disconnected if the cable is
stretched or pulled.
When a fiber optical cable is used on the equipment it shall be suitably protected
against mechanical damage.
The camera must be installed so that the risk of impact on the dome is low.