background image

www.tivolilighting.com    tel: 714-957-6101    fax: 714-427-3458

Copyright © 2021 Tivoli 11.24.2021

7170805

Page 7 of 11

FLEX120

 | Installation

1”

.949”

1.812”

1.031

.673”

1 1/4”

Cut NOYES Channel to size required, if needed.

Apply Adhesive 

(ADH-MB-75AM-10)

 to the inside of 

the flanges, as shown, to adhere the channel to the 
mounting surface. Also, apply glue to the bottom of the 
channel if there is a solid support at the bottom of the 
cutout.

Remove Backing tape and apply FLEX120 to bottom 
surface of the NOYES Extrusion. 

Slide a Spring Clip into the outside slot at the bottom 
of the NOYES Extrusion. Position a Spring Clip on the 
left and right side at each end. There may be additional 
Spring Clips needed along the length of the Channel, 
depending on length. Position Clips every 24”.

1

6

2

3

Installation Option 3A:

 

Mounted in NOYES Channel Glued to Surface

Installation Option 3B:

 

Mounted in NOYES Channel with Spring Clips

NOYES Channel With Lens

Side View

NOYES Channel With Lens

Side View

NOYES Channel

Part No: NOYS-CHAN-SLV-6.5

Cutting Tool

ADH-MB-75AM-10)

Adhesive

ALTON Channel

Part No: ALTN-CHAN-SLV-6.5

FLEX120 Tape

Part No: FLX120

Содержание FLEX120

Страница 1: ...IP65 FLEX120...

Страница 2: ...rements Voltage drop calculations are the responsibility of the installer CAUTION Risk of Damage Handle carefully 1 Do not twist bend fold or crease FLEX120 2 Do not bend or crease lead wire at solder...

Страница 3: ...stallation Identify correct length from spool Make sure surface where FLEX120 is to be installed is smooth clean free of dirt oil and debris Peel off PET tape backing and apply FLEX120 to clean smooth...

Страница 4: ...he Channel Also drill holes every 24 36 along the channel to secure it in place Use appropriate flat head screws for the mounting surface ie wood screws for wood 1 2 3 Installation Option 2 Mounted in...

Страница 5: ...Lens Start the Lens into the Channel at one end and press down Continue to press along the lens working it into the Channel Use Solid End Cap to close non power feed sides of ALTON Channel Attach Sol...

Страница 6: ...ze required if needed Remove Backing tape and apply FLEX120 to bottom surface of the NOYES Extrusion Insert Power Feed Cable through hole in Power Feed End Cap Slide Power Feed End Cap along the Power...

Страница 7: ...0 to bottom surface of the NOYES Extrusion Slide a Spring Clip into the outside slot at the bottom of the NOYES Extrusion Position a Spring Clip on the left and right side at each end There may be add...

Страница 8: ...6 5 NOYS EC 01 Solid End Cap Installation Option 3B Mounted in NOYES Channel with Spring Clips Insert Power Feed Cable through grommet in Power Feed End Cap Slide Power Feed End Cap along the Power Fe...

Страница 9: ...d to Surface Cut NOYES Channel to size required if needed 1 NOYES Channel With Lens Side View NOYES Channel Part No NOYS CHAN SLV 6 5 NOYES Channel Part No NOYS CHAN SLV 6 5 Cutting Tool 3 18 24 18 24...

Страница 10: ...11 FLEX120 Installation Installation Option 3C Mounted in NOYES Channel Fastened to Surface Remove Backing tape and apply FLEX120 to bottom surface of the NOYES Extrusion Attach the Lens Start the Len...

Страница 11: ...to surface using No 6 Flat Head screws supplied by others appropriate for mounting surface ie wood screws for wood Press the FLEX120 into the Mounting Clips Note Minimum bending diameter for FLEX120 i...

Отзывы: