TITAN Technologies International, Inc.
®
9001 Jameel Street, Suite 180 • Houston, TX 77040
Toll-Free: 866.345.8484 • Phone: 281.449.9994 • Fax: 281.449.9996 • Email:[email protected]
http://www.titanti.com
Short guidance
The following steps must be taken before the first start:
•
Fill up hydraulic fluid
(e.g. ISO VG 46) at the filler pipe if necessary until
the oil gauge is filled with oil
•
Connect the plug
to a power source (Consider the electrical data)
•
Disconnect all hoses
to the consumers
•
Close
the
manual shut-off valve
(otherwise pressure-free circulation)
•
Adjust the working pressure
at the pressure limiting valve
•
Build up the pressure
by operating the tracer
⇑
•
Stop
building up the pressure
by releasing the tracer
⇑
•
Release
the pressure
by opening the manual shut-off valve or by
operating the tracer
⇓
CAUTION: ALWAYS CHECK THE MAX. ADJUSTED HYDRAULIC
PRESSURE FIRST WITHOUT THE HOSES OR TOOLS CONNECTED.
THE MAX. PERMISSIBLE HYDRAULIC PRESSURE OF THE SUPPLIED
HYDRAULIC GAUGE MUST NOT BE EXCEEDED.
TURN THE REGULATING KNOB COUNTERCLOCKWISE
→
REDUCES THE
PRESSURE
TURN THE REGULATING KNOB CLOCKWISE
→
INCREASES THE
PRESSURE
Always observe the hydraulic pressure gauge when applying pressure to the
pump.
Safety requires that you read very carefully and understand fully the operation
instructions, prior to turning on and operating the pump.