Titan 190502 Скачать руководство пользователя страница 8

 

STEP 3: INSTALLING GATES AND FINAL TOUCH

 

 

1.

 

Attach 

GATE SWING STOPPER (9)

 onto 

CORNER FRAME-1 (4)

 or 

CORNER FRAME-2 (5)

 

using 

CARRIAGE BOLT M10x60 (20)

FLAT WASHER M10 (21)

SPRING WASHER M10 (22)

and 

HEX NUT M10 (23)

. The order of assembly is to push 

CARRIAGE BOLT M10x60 (20) 

through these parts, and then 

FLAT WASHER M10 (21)

SPRING WASHER M10 (22)

, and 

HEX NUT M10 (23)

 onto the end of the bolt. Fasten hardware but do not tighten. Repeat the 

same procedures to mount the 

STOPPERs

 onto all 4 

CORNER FRAMEs

2.

 

Plug 

TUBE END PLASTIC CAP (16)

 into all open tube ends of 

CORNER FRAMEs

 and DOOR

 

FRAMEs (6)

3.

 

Insert two 

HARNESS LOCK RING (11)

 into 

HARNESS SAFETY BAR (10)

 and attached the 

ends of the 

HARNESS SAFETY BAR (10)

 onto the rear 

DOOR FRAME (6)

 and 

CORNER 

FRAME-2 (5)

 using 

FLAT WASHER M16 (24)

SPRING WASHER M16 (25)

, and 

HEX BOLT 

M16x80 (28)

. The order of assembly is to insert 

SPRING WASHER M10 (22)

 and 

FLAT 

WASHER M10 (21)

 into 

HEX BOLT M16x80 (28)

FASTEN HARDWARE BUT DO NOT TIGHTEN. 

4.

 

Mount 

GATE LATCH (12)

 onto 

CORNER FRAME-2 (5)

 at the front and rear faces of the work 

platform using 

HEX BOLT M10x80 (26)

 and 

HEX LOCK NUT M10 (27)

. The order of 

assembly is to insert 

HEX BOLT M10x80 (26)

 through these parts and fasten with 

HEX LOCK 

NUT M10 (27)

, but do not tighten.

 

5.

 

Insert the hinge shaft of 

GATE FRAME (6)

 into the shaft sleeve of 

GATE FRAME (6)

 . Do this 

for both the front and rear faces of the work platform. Close the gates with the gate latch 
and lock both gates with 

GATE LOCK SAFETY PIN (13) 

on the opposite sides.

 

6.

 

Insert 

LOCK PIN ASSY – FORK (8)

 into the pin brackets at the 

BASE ASSY (1)

 bottom fork 

channels.

 

7.

 

Tighten all hardware gradually and adjust make sure that all sides of the work platform is 
square and level. Use levelling gauge wherever necessary. When squareness and levelling of 
the work platform is assured and all hardware has been tightened, mount three 

SELF 

TAPING BOLT (29)

 on each of the edges of the front and rear faces as shown in the above 

diagram of the 

BASE ASSY (1)

 to reinforce the whole structure.

 

 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание 190502

Страница 1: ...BSK4X8 TLEBSK4X98 190502 191503 191504 Operator s Manual Read the Operator s Manual entirely When you see this symbol the subsequent instructions and warnings are serious follow without exception Your...

Страница 2: ...s the manual of your forklift or telehandler Failure in operating and maintaining the work platform according to the instructions and recommendations could lead to fatal accidence causing serious pers...

Страница 3: ...bled Reference positions left right front back are from forklift cab viewing the work platform STEP 1 INSTALLING CORNER FRAMES KEY DESCRIPTION QTY KEY DESCRIPTION QTY 1 BASE ASSY 1 20 CARRIAGE BOLT M1...

Страница 4: ...t the above procedures for mounting the second CORNER FRAME 1 4 on the right back diagonal corner of the BASE ASSY 1 3 Rest CORNER FRAME 1 5 on the right front corner of the BASE ASSY 1 and align bolt...

Страница 5: ...x70 4 2 TOP GUARD RAIL 2 18 CARRIAGE BOLT M10x80 20 3 UPRIGHT POST ASSY 2 19 CARRIAGE BOLT M10x65 10 4 CORNER FRAME 1 2 20 CARRIAGE BOLT M10x60 28 5 CORNER FRAME 2 2 21 FLAT WASHER M10 62 7 RAIL MOUNT...

Страница 6: ...23 The order of assembly is to push CARRIAGE BOLT M10x60 20 through the holes and then place FLAT WASHER M10 21 SPRING WASHER M10 22 and HEX NUT M10 23 onto the end of the bolt FASTEN BUT DO NOT TIGHT...

Страница 7: ...10 4 5 CORNER FRAME 2 2 22 SPRING WASHER M10 4 6 GATE FRAME 2 23 HEX NUT M10 4 8 LOCK PIN ASSY FORK 8 2 24 FLAT WASHER M16 2 9 GATE SWING STOPPER 2 25 SPRING WASHER M16 2 10 HARNESS SAFETY BAR 1 26 HE...

Страница 8: ...into HEX BOLT M16x80 28 FASTEN HARDWARE BUT DO NOT TIGHTEN 4 Mount GATE LATCH 12 onto CORNER FRAME 2 5 at the front and rear faces of the work platform using HEX BOLT M10x80 26 and HEX LOCK NUT M10 27...

Страница 9: ...lope uneven and slippery ground Make sure the ground is solid enough to hold the forklift or telehandler stably and use outrigger if available Beware of overhead power communication lines and other ob...

Страница 10: ...ns are available the tilt and swing cylinder hydraulics must be disengaged Disengage the lifting lowering hydraulic when the work platform reached the designated height Always check if effective commu...

Страница 11: ...al protective equipment and apparel Each time after use clean the work platform thoroughly and remove all debris and dirt Visually inspect if there are any parts damaged or deformed repair and replace...

Страница 12: ...member of fork 27 56 TLEBS 4X6 TLEBSK4X8 TLEBSK4X98 OVERALL DIMENSIONS L X W X H 72 X 54 3 X 46 7 96 X 54 3 X 46 7 116 X 54 3 X 46 7 PRODUCT WEIGHT 485 LB 542 LB 628 LB LOAD CAPACITY 1700 LB FORK CHAN...

Страница 13: ...13 PARTS DIAGRAM EXPLODED VIEW...

Страница 14: ...DOME HEAD CARRIAGE BOLT M10x60 32 6 GATE FRAME 2 21 FLAT WASHER M10 66 7 RAIL MOUNTING PLATE 1 2 22 SPRING WASHER M10 66 8 LOCK PIN ASSY FORK 2 23 HEX NUT M10 66 9 GATE SWING STOPPER 2 24 FLAT WASHER...

Страница 15: ...lting from or arising out of the use of said equipment This equipment must be used with care by capable and competent individuals under supervision if necessary WARNING Do not over ll Mower should be...

Страница 16: ...16 NEED HELP CONTACT US FIRST 1 800 605 7595 info palletworks com www palletforks com 2021 Titan Brands...

Отзывы: