11
20) Install the shut-off mechanism for the 9000AC model. Screw two long screws into
holes on up-rights, and tighten them with two M6 nuts each. Run shut-off cable through
hole at long screw end on offside up-right and fix it with cable clip, across the power
side long screw hole, to the microswitch on top of power unit, then fix the cable end
with cable clip also. Make it as tight at you can without tripping the cutoff microswitch.
21) Grease the inside corners of the columns.
22) Do not place any vehicle on the lift at this time. Read the operation instructions(pg 12-
14) and cycle the lift up and down several times to ensure safety latches click together
and all air is removed from the system. Ensure all hydraulic fittings are tight and not
leaking. To lower the lift, the safety latch releases must be manually released. Latches
will automatically reset once the lift ascends approximately 17” from base. If latches
click out of sync, tighten the cable on the one that clicks first.
WARNING: DO NOT PERFORM ANY MAINTENANCE OR INSTALLATION
OF ANY COMPONENTS WITHOUT FIRST ENSURING THAT ELECTRICAL POWER
HAS BEEN DISCONNECTED AT THE SOURCE OR PANEL AND CANNOT BE
REENERGIZED UNTIL ALL MAINTENANCE AND/OR INSTALLATION PROCEDURES
ARE COMPLETED.
DANGER: DO NOT RUN POWER UNIT WITHOUT FLUID. DAMAGE TO PUMP
CAN OCCUR. THE POWER UNIT MUST BE KEPT DRY. DAMAGE TO POWER UNIT
CAUSED BY WATER OR OTHER LIQUIDS SUCH AS DETERGENTS, ACID ETC., IS
NOT COVERED UNDER WARRANTY.
Содержание HD2P-9000AC
Страница 30: ...27 FIG 7 9000AC Top Cable Sheave Equalizing Cable 2 Locking Nuts 4 Bottom Cable Sheave Carriage...
Страница 31: ...28 FIG 8 9000AF Bottom Cable Sheave Top Cable Sheave Equalizing Cable 2 Carriage Locking Nuts 4...
Страница 35: ...32 FIG 12 9000AC 12 PARTS FIG 12 16...
Страница 36: ...33 FIG 13 9000AC...
Страница 39: ...36 FIG 14 9000AF...
Страница 40: ...37 FIG 15 9000AF...
Страница 46: ......
Страница 47: ...NOTES...