HEAVY DUTY POWER RACK
ASSEMBLY
STEP 2
Mount the
2”
PULL
-
UP BAR (2)
to the top of the two frames
using four
HEX BOLTS M16x80 (5)
, four
FLAT WASHERS (6)
,
four
SPRING WASHERS (7)
, and four
HEX NUTS M16 (8).
Mount the
1.25”
PULL
-
UP BAR (2)
to the top of the two
frames using four
HEX BOLTS M16x80 (5)
, four
FLAT
WASHERS (6)
, four
SPRING WASHERS (7)
, and four
HEX
NUTS M16 (8).
NOTE:
The
2”
PULL
-
UP BAR (2) should be mounted at the back end
of the UPPER SIDE BRACINGS (1).
The
1.25”
PULL
-
UP VAR (3) should be mounted at the front end
of the UPPER SIDE BRACINGS (1).