background image

HEAVY DUTY POWER RACK 

ASSEMBLY 

 

STEP 2

   

 

Mount the 

2” 

PULL

-

UP BAR (2) 

to the top of the two frames 

using four 

HEX BOLTS M16x80 (5)

, four 

FLAT WASHERS (6)

four 

SPRING WASHERS (7)

, and four 

HEX NUTS M16 (8).

 

 

Mount the 

1.25” 

PULL

-

UP BAR (2) 

to the top of the two 

frames using four 

HEX BOLTS M16x80 (5)

, four 

FLAT 

WASHERS (6)

, four 

SPRING WASHERS (7)

, and four 

HEX 

NUTS M16 (8).

 

 

NOTE:

 

The 

2” 

PULL

-

UP BAR (2) should be mounted at the back end 

 

 

of the UPPER SIDE BRACINGS (1).

 

 

 

 

The 

1.25” 

PULL

-

UP VAR (3) should be mounted at the front end 

 

of the UPPER SIDE BRACINGS (1).

 

Отзывы: