background image

3215 W. North Ave.  •  Melrose Park, IL 60160  •  (800) 729-0307 or (708) 865-8870  •  Fax: (708) 865-2941  •  www.peerlessmounts.com

ISSUED: 06-23-09   SHEET #: 090-9181-1

Max Load Capacity per Arm:

 17.6 lb (8 kg)

Installation and Assembly:

Dual Desktop Two-Link Pole for 15" - 24" LCD monitors

Models: LCT-A1B4C, LCT-A1B4H

Содержание LCT-A1B4C

Страница 1: ...00 729 0307 or 708 865 8870 Fax 708 865 2941 www peerlessmounts com ISSUED 06 23 09 SHEET 090 9181 1 Max Load Capacity per Arm 17 6 lb 8 kg Installation and Assembly Dual Desktop Two Link Pole for 15 24 LCD monitors Models LCT A1B4C LCT A1B4H ...

Страница 2: ...0 865 2112 This product should only be installed by someone of good mechanical aptitude has experience with basic building construction and fully understands these instructions Make sure that the supporting surface will safely support the combined load of the equipment and all attached hardware and components Never exceed the Maximum Load Capacity See page one Always use an assistant or mechanical...

Страница 3: ...0 mm screws 8 8 D M4 x 16 mm screws 8 8 e bar bushing 2 2 F cable guide 4 4 G lower pipe cap 1 1 H upper pipe cap 1 1 J M4 x 8 mm screws 6 6 K 4 mm allen wrench 1 1 L 2 5 mm allen wrench 1 1 M bolt 1 N spring washer 1 o flat washer 1 P bottom washer 1 Q 8 mm wrench 1 Parts List Parts may appear slightly different than illustrated Before you begin make sure all parts shown are included with your pr...

Страница 4: ...face until firmly attached 1 3 3 5 mounting surface clamp mounting surface 1 Clamp Installation Method 1 1 fig 2 2 fig 2 1 Drill 5 13 mm hole into mounting surface Place pipe assembly A onto mounting surface and secure using one bolt M one spring washer N one flat washer O and one bottom washer P as shown in figure 2 1 Tighten bolt M using 8 mm wrench Q as shown in figure 2 2 NOTE Be sure fastener...

Страница 5: ...e assembly A Place bar bushing E over pipe and align with set screw on pipe assembly A and then place arm assembly 2 B over pipe assembly and bar bushing E Attach lower pipe cap G to top of pipe assembly A using two M4 x 8 mm screws J NOTE When installing both arms to pipe assembly be aware of curve direction of arms Arm assembly 1 should be curved upwards and arm assembly 2 should be curved downw...

Страница 6: ...figure 7 2 Bend lower arm to access control bolt Adjust control bolt with 4 mm allen wrench K as shown in figure 7 3 7 Control Bolt Tension Adjustment fig 7 1 fig 7 2 fig 7 3 K NOTES Turn control bolt clockwise to adjust for weight greater than 8 8 lbs 4 kg Turn control bolt counter clockwise to adjust for weight less than 8 8 lbs 4 kg Be careful not to pinch fingers when adjusting arms of arm ass...

Страница 7: ...ews C or D as shown in detail 3 using VESA 75 or VESA 100 mounting pattern as shown in figure 9 1 C or D DETAIL 3 fig 9 1 Loosen pipe assembly set screw using 4 mm allen wrench K then loosen arm assembly set screw using 2 5 mm allen wrench as shown in detail 2 Adjust monitor to desired height as shown in figure 8 1 then retighten all fasteners 8 Height Adjustment of Arm DETAIL 2 fig 8 1 ARM ASSEMB...

Страница 8: ...ute through arm assembly Open gap to press fit cables as shown in detail 4 Loop cords through cable guide F and attach to arm using one M4 x 8 mm screw J as shown below 11 10 Cable Management cable cable DETAIL 4 2009 Peerless Industries Inc All rights reserved All other brand and product names are trademarks or registered trademarks of their respective owners J F ...

Отзывы: