4
6. Connection Diagram
7. Operation
•
Turn the power on to the isolating switch and test for correct operation.
Connect the 3 core mains supply cable
from
the unit as follows:-LIVE (Brown or
Red) L
NEUTRAL (Blue or Black) N
EARTH (Green/Yellow)
E
connect to main power
brown
blue
yellow & green
brown
blue
yellow & green
L
N
E
Содержание Sure time STFL10PIRB
Страница 1: ...LED PIR Floodlight Models STFL10PIRB STFL20PIRB STFL30PIRB STFL50PIRB...
Страница 13: ...TG IQ V1...