![Timeguard CLLED44PIRB Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/timeguard/clled44pirb/clled44pirb_installation-and-operating-instructions-manual_1117297003.webp)
2
6.
Using the back plate as a template mark the position for the holes.
Note the back plate must be mounted in the correct orientation,
following the ‘UP’ arrow.
7.
Drill the wall using a 6mm Ø masonry drill bit making sure not to infringe
or compromise any gas, water pipes or cables. Insert the supplied rawl plugs
into the previously drilled holes.
8.
Pierce the pre-installed rubber grommet and pass through the 230V AC 50Hz
mains supply cable. Ensuring the IP rating of the fitting is maintained
(Silicon sealant may be used).
• Manual Override:
Yes, Pulse
• CE Compliant
Slave Loads:
Up to 5 sets of CLLED42B and CLLED43WH can be used as a slave if additional
lanterns are required. The Master units either CLLED44PIRB or CLLED45PIRWH
will trigger all slave units simultaneously once the PIR has been activated.
4. Installation
1.
IMPORTANT Switch off the electricity at the fuse box by removing the relevant
fuse or switching off the circuit breaker before proceeding
with the installation.
2.
An isolating switch should be installed to switch the power to the unit
on and off. This is for maintenance purposes.
3.
Unscrew the security nuts located on the front of the unit.
4.
Pull away the back plate from the wall mount.
5.
Separate the terminal block and back plate by using a flat head screw driver;
do not disconnect any pre-installed cables.
Lamp Holder
PIR Sensor
Seal Ring
(Gasket)
Terminal
Block
Pre-Installed
Cable
Wall Mount
Seal Ring
(Gasket)
Back Plate
Machine
Threaded Bolts