background image

Stage

16

Stage

17

Page  12  of  1

5

Bed  

Assembly - Use Pack 'D'

K

x2

L

x1

K

L

SMALL GAP

D

H

C

J

B

C

L

Bolt into centre of long holes

L

x1

B

x6

C

x12

D

x1

x6

J

x6

H

5

Содержание Copenhagen Ottoman TV Bed

Страница 1: ...t the packaging is disposed of in a safe environmentally friendly way CAUTION There are small components used in the construction of this unit These loose items should be d i o v a o t y l b m e s s a...

Страница 2: ...ck B x1 x1 x1 b x2 Bolt Sets M8x25mm HARDWARE NEEDED FOR FITTING GAS LIFT MECHANISMS PACK A E a Gas Lift Mechanisms x1 x1 E b Spring Washers for M8 bolts B A x8 Bolts M8x30mm for fitting gas lift mech...

Страница 3: ...s Tips Assembly requires two persons Approximate time to assemble this product 2 1 2 Hrs In the unlikely event of missing or damaged parts please contact your retailer Please have this guide at hand q...

Страница 4: ...LIGN WITH THE HOLES MAKE SURE FIXING BOLTS ARE IN THE CENTRE OF THE LONG HOLES B A C D BOLTS SHOULD BE IN CENTRE OF LONG HOLES E a H H H E b Fitting Gas Lift Mechanisms Use Pack A 1 2 Stage 3 D x1 B k...

Страница 5: ...s shown in the diagram then tighten all bed assembly bolts 100 Bed Assembly Use Pack B Stage 5 Bed Assembly Use Pack C G G x12 IMPORTANT MAKE SURE WHEN FITTING THE BARREL NUTS THAT THE HOLE IS IN CORR...

Страница 6: ...h Fabric Base Cover 7 to bottom of side panels headboard footboard with the velcro tape Make sure fabric is fixed evenly all round WARNING TEAM LIFT ITEM This item is either too heavy or too bulky for...

Страница 7: ...of 15 A D C A x4 C x4 D x1 Stage 9 Connect Main Power Lead 13 to your wall socket for safety this must be an earthed supply 13 Bed Assembly Use Pack C CAREFULLY LOWER BED BACK DOWN EQUALLY BE CAREFUL...

Страница 8: ...ied with your TV TIP BEFORE FITTING THE TV PUSH CABLES THROUGH EACH DUCT FROM THE TOP CHOOSE THE BEST SIDE TO USE DEPENDING ON WHERE THE CONNECTION PORTS ARE ON BACK OF YOUR TV NEVER CROSS CABLES FROM...

Страница 9: ...Stage 12 Page 9 of 15 Bed Assembly Use Pack C x2 TV INSTALLATION KIT a Screw Washer set M8 M6 M4 a a Loosen Tighten x1 Allen Key 5mm 4mm 2 5mm b...

Страница 10: ...0 ADAPTOR TV Power Lead supplied with your TV PLUG IN KEEP ALL CABLES TIGHT USE CLIPS TIES PROVIDED Keep wires tight peel off cover from cable clips adhere to back of TV Note For illustration purposes...

Страница 11: ...Stage 14 Page 11 of 15 Bed Assembly Use Pack C Stage 15 TV Power Lead supplied with your TV Press the DOWN button to lower the TV lift Slat Frame Support Bar 14 1 2 19...

Страница 12: ...Stage 16 Stage 17 Page 12 of 15 Bed Assembly Use Pack D K x2 L x1 K L SMALL GAP D H C J B C L Bolt into centre of long holes L x1 B x6 C x12 D x1 x6 J x6 H 5...

Страница 13: ...13 of 15 Stage 18 Stage 19 8mm Hold frame then tighten all six bolt sets 100 using spanner L Allen key D Carefully lay frame down Make sure there is an even gap each side of about 8mm as in the sketc...

Страница 14: ...ill square see Step 4 Depending on the weight of the mattress the speed of the lift will vary so be careful until you get used to the speed Always use the strap to lift or lower the frame keep fingers...

Страница 15: ...y part of the equipment if something needs to be checked disconnect the power first Do not insert anything into the footboard as this could seriously damage the TV and or the TV lifting equipment and...

Отзывы: