86
Post & Rail Preparation
Trim 4x4 wood posts to 35 - 1/2” above deck surface.
Trim Post Covers to length:
38” for a lit post
40-1/8” for an unlit post
For best results, use a miter saw with a fine toothed blade to
make Post Cover cuts. Check cuts for square.
Feed main 16/2AWG cable between post and Post Covers. (See
Wire Connections
section for more info.)
Post & Post Covers
5 x 5:
RadianceRail
4 x 4:
Ornamental Rail, RadianceRail Express
Trim 4x4 wood posts to 34-1/2” above deck surface.
In order to provide clearance for wiring between the post and Post
Cover you must create a wire channel.
If you plan to install a post mounted Accent Light, you must rout a
slot down the post to the desired fixture position. (See Accent Light
instructions.)
Trim Post Covers to length:
36-7/8” for a lit post
39” for an unlit post.
For best results, use a miter saw with a fine toothed blade to make
Post Cover cuts. Check cuts for square.
Feed main 16/2AWG cable up or down post using prepared feature.
(See
Wire Connections
section for more information)
Post & Post Covers
Install Support Rails and Balusters as normal, DO NOT install Top
Rail yet.
Drill a 5/8” hole through the
Post Cover on centerline,
directly above rail Mounting
Blocks.
After running all wiring, secure four
Cable Guides to Support Rail using #8
x 3/4” screws. Use the Cable Guides to
pre-drill holes thru the Support Rail
with a 3/16” bit.
Attach Top Rails before installation of Post Cap Lights. Use the holes
that were pre-drilled through the Cable Guides to attach the Top
Rail. FAILURE TO USE THESE HOLES MAY RESULT IN WIRE DAMAGE.
Attach Top Rails before installation of Post Cap Lights. Use the holes
that were pre-drilled through the Cable Guides to attach the Top Rail.
FAILURE TO USE THESE HOLES MAY RESULT IN WIRE DAMAGE.
Make a notch on the centerline of the Top
Rail by boring a 3/4” hole centered 1/2"
back from the end of the rail, then cut it
out to form an open slot.
Railing
Railing (Only for Ornamental Rail)
Chamfer the corner
of the post
Rout a 1/4” by 1/4”
slot down the post
Run wires up
corner voids
created by
Post Cover Ribs.
OR
(The following instructions are for a rail height of 36”)
(The following instructions are for a rail height of 36”)
1
2
3
1
2
3
4
5
Install Universal Rails and Balusters as normal, DO NOT install Top
Rail yet.
Drill a 5/8” hole through the Post Cover on
centerline, directly above the Universal
Rail.
After running all wiring, secure four
Cable Guides to Universal Rail using
#8 x 3/4” screws. Position every 4th
Baluster, avoiding Balusters and
Baluster Mounting Blocks if installed.
Use the Cable Guides to pre-drill holes
thru the Universal Rail with a 3/16”
bit.
Make a notch on the centerline of the Top
Rail by boring a 3/4” hole centered 1/2”
back from the end of the rail, then cut it
out to form an open slot.
1
2
3
4
5
1
2
3
4
5
SC
RE
W
HO
LE
DR
ILL
THR
U
3/1
6”
SC
RE
W
HO
LE
DR
ILL
THR
U
3/1
6”
Cable Guide Placement
NOTE: Do not rout a wire
channel where a rail is to be
mounted.
x
Содержание DeckLites