4
2.2
Electric connection
The plug-in terminals needs to be removed before accessing the input terminals.
Inputs L1, L2, L3, N, I1, I2, I3, Aux.supply
Wire section:
6.0 mm² / 10 AWG
Clamp opening size:
3.2 × 3.9 mm
Wire stripping:
max 9 mm
Recommended torque:
0.8 - 0.88 Nm / 7.2 - 7.9 in.lbs
2.3
Connection diagrams
–
System connection
LQT40F system connection is programmable from single phase to 4-wire balanced or unbalanced
connection.
Configurable System Connection
System
connection
Application
I1
I2
I3
U1
U2
U3
N
U12
U23
U31
-00
4wire, 3 phase symmetric load
X
-
-
X
-
-
X
-
-
-
-01
1-wire, 1 phase
X
-
-
X
-
-
X
-
-
-
-02
3-wire, 3 phase symmetric load
X
-
-
-
-
-
-
X
-
-
-03
3-wire, 3 phase symmetric load
X
-
-
-
-
-
-
-
X
-
-04
3-wire, 3 phase symmetric load
X
-
-
-
-
-
-
-
-
X
-05
3-wire, 3 phase symmetric load
X
-
-
X
X
X
-
X
X
X
-09
3-wire, 3 phase asymmetric load
X
-
X
X
X
X
-
X
X
X
-11
4-wire, 3 phase asymmetric load
X
X
X
X
X
X
X
X
X
X
-11
4-wire, 3 phase asymmetric load Open Delta
X
X
X
X
X
X
-
X
X
X