BEFORE YOU GET STARTED
04
tigersheds.com
0113 205 4189
TOOLS REQUIRED:
We recommend using the following tools (not supplied):
HAMMER
DRILL
LADDER
TAPE MEASURE
SHARP KNIFE
SPIRIT LEVEL
SCREW
• Assembly is relatively straightforward if you follow these step by step instructions.
• We recommend getting everything aligned properly before screwing together and that
screw holes should be pre-drilled to avoid splitting the timber.
(Do not come pre-drilled).
IMPORTANT
• Before assembly please make sure you have a suitable base ready to erect your building on.
• This base
MUST
be firm and level to ensure that the building is assembled properly and lines up.
• Please carefully unpack the components in your delivery, and remove the timber supports that make up the
delivery pallet.
•
CAUTION:
Parts may have moved during transportation. Be careful when unpacking supplied shed.
•
DO NOT
start your build until you have checked that all the parts of your building are present, correct and in a
suitable condition.
• Pre-drilling screw holes is recommended to reduce the chances of the timber framing splitting.
• If you are organising a third party to install your building, it is best practice not to schedule this immediately on receipt of your
order, to give you time to check your delivery.
RUBBER MALLET
WOOD SAW
CN13
FIXING KIT GUIDE:
Clout Nails
(13mm Galvanised - QTY
175)
BS25
Black Drywall Screw
(3.5x25mm - QTY 20)
N40
Nail
(40mm Galvanised - QTY 55)
N65
Nail
(65mm Bright - QTY 50)
S50
Screws
(4x50mm - QTY 50)
S90
Screws
(5x90mm - QTY 12)
2TBB
Black Turnbutton
(2 Inch - QTY 1)
DB
Drop Bolt
(QTY 1)