Assembly Section 2-29
ASSEMBLY
MAIN BOOM:
“A” Port, Boom UP:
7-9 Seconds
(Note: Extend secondary boom completely; roll deck to be level with ground, and lower
main boom until deck is on ground. Now index main boom “up” function and determine the
time required for main boom to rise completely.)
“B” Port, Boom Down: 6-8 Seconds
(Note: Extend secondary boom completely, roll deck to be level with ground, and raise the
main boom to “full up”. Then index the main boom “down” function to determine the amount
of time required for the deck to contact the ground. CAUTION: Stop the boom just as the
deck contacts the ground.)
SECONDARY
BOOM
:
“A” Port, Boom Out:
8-10 Seconds
(Position main boom full up, roll deck out until deck cylinder is fully retracted, and bring
secondary boom in completely. Then index the secondary boom “out” function and determine
the time required for boom to extend out completely.)
“B” Port, Boom In:
8-10 Seconds
(Position the main boom full up, roll deck out until deck cylinder is fully retracted, and
extend secondary boom completely. Then index the secondary boom “in” function and
determine the time required for boom to come in.)
DECK ROLL:
“A” Port, Deck Out:
7-9 Seconds
(Raise main boom to vertical, extend secondary boom out slightly so that deck can be
articulated without contacting the main boom, and roll deck in until deck cylinder is completely
extended. Then index the deck roll “out”
function and determine the time required for
the deck to roll out.)
“B” Port, Deck In:
Target 7-9 Seconds (but DO NOT use Limit Screw)
(Raise main boom to vertical, extend secondary boom out slightly so that deck can be
articulated without contacting the main boom, and roll deck out until deck cylinder is
completely retracted. Then index the deck roll “in” function and determine the time required
for the deck to roll in.)
BOOM
SWIVEL:
“A” Port, Boom Aft: 14-16 Seconds
(Extend booms completely; rotate head to be level with ground, lower main boom until deck
is just above ground, and swivel boom full forward. Then index the boom swivel “aft”
function and determine the time required for the boom to swivel aft. Use caution when doing
this, stop boom before main boom contacts tire.)
“B” Port, Boom Forward:
14-16 Seconds
(Extend booms completely, rotate head to be level with ground, lower main boom until
deck is just above ground, and swivel boom aft and until near tire. Then index the boom
swivel “forward” function and determine the time required for the boom to swivel full forward.
)
Содержание CNH T6010-80
Страница 4: ......
Страница 6: ......
Страница 7: ...SAFETY SECTION Safety Section 1 1 ...
Страница 18: ...Safety Section 1 12 SAFETY 002369 HYDRAULIC TANK 00725746 INSIDE OF CAB 00769737 MOWER DECK PART NO LOCATION ...
Страница 24: ...Safety Section 1 18 SAFETY 33743 INSIDE OF CAB 06550012 INSIDE OF CAB PART NO LOCATION ...
Страница 29: ...Safety Section 1 23 SAFETY 34852 HYDRAULIC TANK TB1011 MOWER DECK ...
Страница 32: ...Safety Section 1 26 SAFETY ...
Страница 33: ...ASSEMBLY SECTION Assembly Section 2 1 ...
Страница 57: ...Assembly Section 2 25 ASSEMBLY Picture 4 Picture 5 ...
Страница 62: ...Assembly Section 2 30 ASSEMBLY ...
Страница 65: ...OPERATION SECTION Operation Section 3 1 ...
Страница 80: ...Operation Section 3 16 OPERATION ...
Страница 81: ...MAINTENANCE SECTION Maintenance Section 4 1 ...
Страница 106: ...Maintenance Section 4 26 MAINTENANCE ...
Страница 107: ...PARTS SECTION NEW HOLLAND T6000 BENGAL BRUTE Parts Section 5 1 ...
Страница 110: ...Parts Section 5 4 TRACTOR MOUNT KIT MAIN FRAME ...
Страница 112: ...Parts Section 5 6 4 CYL TRACTOR MOUNT KIT HYDRAULICS BRAKE VALVE ...
Страница 114: ...Parts Section 5 8 6 CYL TRACTOR MOUNT KIT HYDRAULICS BRAKE VALVE ...
Страница 116: ...Parts Section 5 10 AXLE BRACE BATTERY BOX ...
Страница 118: ...Parts Section 5 12 TRACTOR MOUNT KIT SWEEPER MOUNT ...
Страница 120: ...Parts Section 5 14 BOOM MOUNT KIT ...
Страница 122: ...Parts Section 5 16 4 SP CABLE CONTROLS SELECTOR VALVE ...
Страница 124: ...Parts Section 5 18 LIFT VALVE 4 SP HUSCO LOAD SENSE LRS ...
Страница 126: ...Parts Section 5 20 LIFT VALVE 4 SP HUSCO POWER BEYOND LRS ...
Страница 128: ...Parts Section 5 22 5 SP CABLE CONTROLS SELECTOR VALVE ...
Страница 130: ...Parts Section 5 24 LIFT VALVE 5 SP HUSCO LOAD SENSE LRS ...
Страница 132: ...Parts Section 5 26 LIFT VALVE 5 SP HUSCO POWER BEYOND LRS ...
Страница 134: ...Parts Section 5 28 JOYSTICK AND SWITCH BOX ...
Страница 136: ...Parts Section 5 30 LIFT VALVE 5 SP DANFOSS LOAD SENSE LRS ...
Страница 138: ...Parts Section 5 32 LIFT VALVE 5 SP DANFOSS POWER BEYOND LRS ...
Страница 140: ...Parts Section 5 34 MIRROR BRACKET ...
Страница 142: ...Parts Section 5 36 BOOM POLYCARBONATE CAB SAFETY WINDOW KIT R 00 00 ...
Страница 150: ...Parts Section 5 44 SWITCH BOX SCHEMATIC DANFOSS ...
Страница 151: ...Parts Section 5 45 SELECTOR VALVE SCHEMATIC ...
Страница 154: ...Parts Section 5 48 HYDRAULIC TROUBLESHOOTING GUIDE ...
Страница 155: ...Parts Section 5 49 ELECTRICAL TROUBLESHOOTING GUIDE ...
Страница 156: ...Parts Section 5 50 ...
Страница 157: ...BENGAL BRUTE COMMON SECTION COMMON PARTS SECTION Common Section 6 1 ...
Страница 161: ...Bengal Brute Common Section 6 5 NOTES PAGE INTENSIONALLY LEFT BLANK ...
Страница 162: ...Bengal Brute Common Section 6 6 BENGAL BRUTE ARM 05 25 05 ...
Страница 164: ...Bengal Brute Common Section 6 8 BENGAL BRUTE ARM PREFORMED TUBES 05 25 05 ...
Страница 166: ...Bengal Brute Common Section 6 10 BOOMREST BENGAL BRUTE ...
Страница 168: ...Bengal Brute Common Section 6 12 BENGAL BRUTE ROTARY PIVOT ASSY 05 25 05 ...
Страница 170: ...Bengal Brute Common Section 6 14 BENGAL BRUTE FLAIL PIVOT ASSY 05 25 05 ...
Страница 172: ...Bengal Brute Common Section 6 16 50 BOOM ROTARY MOWER ASSY 05 25 05 ...
Страница 174: ...Bengal Brute Common Section 6 18 60 ROTARY MOWER ASSEMBLY ...
Страница 180: ...Bengal Brute Common Section 6 24 50 BOOM FLAIL DRIVE ASSY 05 25 05 ...
Страница 182: ...Bengal Brute Common Section 6 26 50 BOOM FLAIL CUTTER ASSY 05 25 05 ...
Страница 184: ...Bengal Brute Common Section 6 28 63 BOOM FLAIL DRIVE ASSY 05 25 05 ...
Страница 186: ...Bengal Brute Common Section 6 30 63 BOOM FLAIL CUTTER ASSY 05 25 05 ...
Страница 193: ...Bengal Brute Common Section 6 37 PAGE INTENSIONALLY LEFT BLANK NOTES ...
Страница 194: ...Bengal Brute Common Section 6 38 ROTARY MOWER SPINDLE ASSY ...
Страница 196: ...Bengal Brute Common Section 6 40 MOWER SPINDLE ASSEMBLY 34980 ...
Страница 198: ...Bengal Brute Common Section 6 42 RESERVOIR TANK FILTER ASSEMBLY ...
Страница 200: ...Bengal Brute Common Section 6 44 5 SPOOL DANFOSS VALVE 06 29 06 ...
Страница 202: ...Bengal Brute Common Section 6 46 06 29 06 5SP HUSCO VALVE LOAD SENSE 06502038 ...
Страница 204: ...Bengal Brute Common Section 6 48 06 29 06 4SP HUSCO VALVE LOAD SENSE 06502057 ...
Страница 206: ...Bengal Brute Common Section 6 50 05 25 05 HYDRO PUMP TSR MOTOR TSR MOTOR FRONT PUMP ...
Страница 208: ...Bengal Brute Common Section 6 52 50 60 ROTARY MOWER MOTOR 05 25 05 ...
Страница 215: ...Bengal Brute Common Section 6 59 JOYSTICK SWITCHBOX SCHEMATICS ...
Страница 216: ...Bengal Brute Common Section 6 60 SELECTOR VALVE SCHEMATIC ...
Страница 219: ...Bengal Brute Common Section 6 63 HYDRAULIC TROUBLESHOOTING GUIDE ...
Страница 220: ...Bengal Brute Common Section 6 64 ELECTRICAL TROUBLESHOOTING GUIDE ...
Страница 223: ...Bengal Brute Common Section 6 67 CLEAN CUTTER SECTION CLEAN CUTTER BOOM ...
Страница 230: ...Bengal Brute Common Section 6 74 ...
Страница 231: ...Bengal Brute Common Section 6 75 FIRE SYSTEM SECTION FIRE SUPRESSION SYSTEM ...
Страница 232: ...Bengal Brute Common Section 6 76 FIRE SUPRESSION SYSTEM PARTS ...
Страница 234: ...Bengal Brute Common Section 6 78 FIRE SUPRESSION SYSTEM WIRING ...
Страница 235: ...WARRANTY SECTION Warranty Section 7 1 ...
Страница 236: ... ...
Страница 240: ...Printed in USA Tiger Corporation ...