Tier1 WH-HD-IRN-MG-1054 Скачать руководство пользователя страница 5

5

SPECIFICATIONS

MODEL SPECIFICATIONS

MODEL

RESIN 

CU FT

CAPACITY 

GRAINS

FLOW RATE GPM

MINERAL 

TANK SIZE

BRINE 

TANK SIZE

SALT CAP 

LBS

SHIP 

WEIGHT 

LBS

SERVICE BACKWASH

WH-HD-IRN-MG-948

1.00 30,000

10.0

2.0

9 X 48

18 X 35

120

120

WH-HD-IRN-MG-1054

1.50 45,000

12.0

4.0

10X54

20 X 37

160

151

• 

At the stated service flow rates, the pressure drop through these devices will not exceed 15 psig.

•  The manufacturer reserves the right to make product improvements which may deviate from the 

specifications and descriptions stated herein, without obligation to change previously manufactured 

products or to note the change.

•  Do not use water that is microbiologically unsafe without adequate disinfection before or after the 

system.

•  Iron content must not exceed 5 ppm. Periodic media cleaning is required by Pro-Res cleaner if iron 

level exceeds 0.3 ppm.  Inlet water which contains measurable levels of chlorine or chloramines may 

adversely affect the resin life. 

Working Temperature

40-100°F (4-37°C)  (Do not subject the unit to freezing temperatures)

Working Pressure

30-125 PSIG (137-861 kPa)

Voltage

120V / 60 Hz

Pipe Size

3/4" or 1"

OPERATING CONDITIONS

SYSTEM DIMENSIONS

MODELS

A (INCHES)

B (INCHES)

WH-HD-IRN-MG-948

57

9

WH-HD-IRN-MG-1054

63

10

4

5

B

Twin Tank Model

A

Models 

A (Inches)

B (Inches)

57”

9"

63”

10"

Model  

Capacity Grains 

Flow Rate 

Mineral 

Tank 

Size 

Resin 

Cu. Ft. 

Brine Tank Size 

Inches

Salt 

Cap 

Lbs 

Shipping 

Weight 

Lbs

@ 15 lbs/cu ft

Factory  

Setting

@10 lbs/

cu ft)

@6 lbs/

cu ft

Service 

USGPM 

Backwash 

USGPM 

WH-HD-IRN-MG-948

30, 000

26,500

22,000

10.0

2.0

9 x 48 1.00

18.1 X 34. 7

270

1 20

WH-HD-IRN-MG-1054

45, 000

39,750

33,000

12.0

2.4

10 x 54 1.50

18.1 X 34.7

270

151

SPECIFICATION

Working Temperature = 34-110°F (1-43°C)

(Do not subject the unit to freezing temperatures)

Working Pressure = 30-125 PSIG (137-861 kPa)

Voltage = 120V / 60 Hz

Pipe Size = 3/4” or 1”

•  At the stated service flow rates, the pressure drop 

through these devices will not exceed 15 psig.

•  Changing salt settings from factory setting may 

require changing injector sizes to achieve stated 

capacities

•  The manufacturer reserves the right to make product 

improvements which may deviate from the 

specifications and descriptions stated herein,

without obligation to change previously manufactured  

products or to note the change.
*  Do not use water that is microbiologically unsafe 

without adequate disinfection before or after the 

system.

*  Iron content must not exceed 1 ppm. Beyond 1 ppm 

an iron softener must be used. Periodic media 

cleaning is required by Pro-Res Cleaner is iron level 

exceed 0.3 ppm

SYSTEM DIMENSIONS

WH-HD-IRN-MG-948

WH-HD-IRN-MG-1054

Содержание WH-HD-IRN-MG-1054

Страница 1: ...refully before operation 2 Avoid pinched o rings during installation by applying NSF certified lubricant to all seals provided with install kit 3 This system is not intended for treating water that is...

Страница 2: ...DIMENSIONS 5 INSTALLATION UNPACKING INSPECTION 6 BEFORE INSTALLATION 7 PREPARATION INSTALLATION STEPS 8 INSTALLING BRINE TANK 9 WATER SOFTENER INSTALLATION 10 BASIC PRINCIPLES STARTUP INSTRUCTIONS 11...

Страница 3: ...f iron manganese sulfur and sediments Damage to pistons seals and or spacers within the control valve are not covered in this warranty due to the harsh environment X X It is recommended to regularly i...

Страница 4: ...ystems can achieve Operational efficiency is the actual efficiency after the system has been installed It is typically less than the efficiency due to individual application factors including water ha...

Страница 5: ...unit to freezing temperatures Working Pressure 30 125 PSIG 137 861 kPa Voltage 120V 60 Hz Pipe Size 3 4 or 1 OPERATING CONDITIONS SYSTEM DIMENSIONS MODELS A INCHES B INCHES WH HD IRN MG 948 57 9 WH H...

Страница 6: ...eady to use them What is included in the box 1 Control Valve 2 Tank 3 Parts Box 4 Owner s Manual 5 Drain Hose Clamp 6 Brine Tank Assembly There are 5 Red clips Please check to make sure you have all o...

Страница 7: ...lation only be completed by a competent installer or plumbing professional to insure this product is installed in accordance with local plumbing codes s Two adjustable wrenches s Additional tools may...

Страница 8: ...ge to the valve 6 Drain Line connection Using Teflon tape screw the 1 2 hose barb and attach o ring into the drain port in the valve Attach drain hose to the hose barb and tighten securely with a hose...

Страница 9: ...embly elbow and hand tighten the nut In many cases the brine line already come installed from the factory Leave the other end of the brine line tube inside the brine tank f For installation of brine t...

Страница 10: ...ARROWS ON THE BYPASS ASSEMBLY INDICATING DIRECTION OF WATER FLOW CAUTION Never insert drain line directly into a drain sewer line or trap Always allow an air gap between the drain line and the wastewa...

Страница 11: ...people is displayed press SET to complete programming TIME 08 27 AM KEYPAD 4 Add Salt to the brine tank 4 Put up to 3 40 lb bags of water softener salt in the brine tank The unit will automatically f...

Страница 12: ...rdness forWater where Iron or Manganese is Present From your water analysis Iron x 4 grains of hardness and or Manganese x 8 grains of hardness These numbers can be found on your water analysis report...

Страница 13: ...t to break up the bridge This should always be followed up by allowing the unit to use up any remaining salt and then thoroughly cleaning out the brine tank Allow four hours to produce a brine solutio...

Страница 14: ...tor assembly should be cleaned or replaced every year depending on the inlet water quality and water usage The seals and spacer cartridge should be inspected cleaned or replaced every year depending o...

Страница 15: ...e powerhead from the valve body assembly 6 Replace the powerhead by reverse following the steps in this section Piston Screw Washer 2 X Screws from Powerhead Powerhead Assembly Valve Body Assembly Met...

Страница 16: ...CLEAN INJECTOR ASSEMBLY PISTON AND OR BRINE VALVE ASSEMBLY REPLACEMENT 3 2 4 1 1 Follow steps 1 to 6 of powerhead removal 2 Remove four screws from the plate on the valve body 3 Remove the plate from...

Страница 17: ...se is determined by the quantity of iron in your water consult your local representative or follow thedirections on the resin cleaner package Res Up Feeders attach to your brine tank and automatically...

Страница 18: ...touches the bottom of the bottle Insert the other end of the tube completely into the hole in the brine well cap Automatic feeding will start in a few hours INSTALL RES UP FEEDER IN SQUARE BRINE TANK...

Страница 19: ...ettings should only be adjusted by a qualified person This function is to accept the values if changed and advance to the next page in the menu These buttons are used to increase or decrease the value...

Страница 20: ...t be changed DELAY SETTINGS The delay settings are used to precisely stop the motor piston in the correct position This value is factory set and should not be changed MASTER OPTIONS LEVEL III Press SE...

Страница 21: ...EFILL 11 1 MIN BRINE 60 MIN BRINE 60 MIN RINSE 10 MIN RINSE 10 MIN RINSE 10 MIN REFILL 11 1 MIN REFILL 11 1 MIN REFILL 11 1 MIN REG TIME 12 00 AM BACKWASH 10 MIN RINSE 10 MIN SOFTENER MODE FILTER MODE...

Страница 22: ...0 15 AM REG DYS 03 FILTER MODE CAUTION Thevaluesinthispageareforillustrationpurposeand canbechangedbythefactorywithoutnotice Please contactCustomerServicetoconfirmpropersettings CALENDAR CLOCK METER I...

Страница 23: ...NS For questions about your Tier1 whole home water system product installation or performance troubleshooting please call Tier1 Technical Support at 1 855 378 9116 Monday Friday 8 am 5 pm central time...

Отзывы: