background image

TIE DOWN 

Safety Products Division

800-241-1806   •   404-344-0000  •  www.tiedown.com

E1805, Rev.  10/12/21

7

Hatch Rail System

Cross Over Bracket installation

20”

40”

Tools needed for this step:

 

5/16” Hex Key

 

Tape Measure  

Hardware required for this step: 

Qty.

 

Cross Over Bracket  (J) 

7

Slide cross over brackets over vertical post as shown in
Fig 7-1. The lower cross over bracket should be
positioned approximatively 20 in. from the bottom of the 
corner mounting bracket. Lightly tighten the 3/8” nut on 
the cross over bracket. 

The top cross over bracket should be positioned
approximatively 40 in. from the bottom of the corner 
mounting bracket. Lightly tighten the 3/8” nut on the 
cross over bracket.

Repeat the cross over bracket assembly for the remaining 
vertical posts. Do not tighten brackets.

Fig 7-1

Fig 7-2

Содержание 71089

Страница 1: ...own to the State of California to cause cancer For more information WARNING This product can expose you to chemicals including Nickel which is known to the State of California to cause cancer For more...

Страница 2: ...I K J L M Description Box 2 of 2 Qty E Corner Mounting Bracket 4 F Hex Bolt 3 8 x1 1 8 16 G Threaded Nut Clip 16 H Nylock Nut 3 8 8 I Carriage Bolt 3 8 x 3 1 2 8 J Cross Over Bracket 8 K Swing Gate P...

Страница 3: ...Hardware required for this step Qty Corner Mounting Bracket E 4 Carriage Bolt 3 8 x1 1 8 F 16 Threaded Nut Clip G 16 Place the corner mounting bracket in position as show in Fig 3 1 Using the brackets...

Страница 4: ...ware required for this step Qty Hatch Rail Vertical Post A 3 Nylock Nut 3 8 H 6 Carriage Bolt 3 8 x 3 1 2 I 6 Install three post leaving the swing gate post for last for installation Slide the carriag...

Страница 5: ...step Qty Hatch Rail Gate Assembly C 1 Swing Gate Pin 3 8 x3 1 4 K 2 Swing Gate Tension Spring L 2 Swing Gate Safety Pin M 2 Hatch Rail Swing Gate Post D 1 Lay the Swing Gate Assembly tread brite side...

Страница 6: ...Hatch Rail Swing Gate Post D 1 Cross Over Bracket 1 Slide cross over bracket from the bottom of the swing gate post Loosely tighten the cross over bracket nut See Fig 6 1 Mount the swing gate post to...

Страница 7: ...er vertical post as shown in Fig 7 1 The lower cross over bracket should be positioned approximatively 20 in from the bottom of the corner mounting bracket Lightly tighten the 3 8 nut on the cross ove...

Страница 8: ...Using a level level the horizontal rails Tighten the 3 8 grub screw for the horizontal rails See Fig 8 2 Using your hand hold the bottom of the cross over bracket with the hatch post Do not move the b...

Отзывы: