background image

DOCK-SAFE 

MANUAL BOOM GATE

Installation Procedure

IP34 – Dock-Safe Manual Boom Gate   ©  Copyright 2016   

www.barriergroup.com.au

Содержание DOCK-SAFE

Страница 1: ...DOCK SAFE MANUAL BOOM GATE Installation Procedure IP34 Dock Safe Manual Boom Gate Copyright 2016 www barriergroup com au ...

Страница 2: ...x1 x1 x1 NOT TO SCALE CONTENTS A B STANDARD 4500mm C IP34 Dock Safe Manual Boom Gate Copyright 2016 www barriergroup com au ...

Страница 3: ...STEP 1 4x M20 fixing to suit IP34 Dock Safe Manual Boom Gate Copyright 2016 www barriergroup com au ...

Страница 4: ...STEP 2 IP34 Dock Safe Manual Boom Gate Copyright 2016 www barriergroup com au ...

Страница 5: ...STEP 3 2x M12 x 40 zinc hex bolt 2x M12 zinc hex nut 4x M12 bright washer IP34 Dock Safe Manual Boom Gate Copyright 2016 www barriergroup com au ...

Страница 6: ...ON GATE SPEED MUST BE ADJUSTED PRIOR TO FIRST USE 2 x 10ga x16mm wafer head STEP 5 2 x 10ga x16mm wafer head CAUTION message must be applied on rail prior to operation Recommended 500mm Recommended 1000mm IP34 Dock Safe Manual Boom Gate C opyright 2016 www barriergroup com au ...

Страница 7: ...STEP 6 4 x M12 fixing to suit IP34 Dock Safe Manual Boom Gate C opyright 2016 www barriergroup com au ...

Страница 8: ...ORE YOU START 1 The installer must ensure the desired mounting point for the gate is level plumb and rigid 2 Use fixings appropriate to the material into which they are being fixed not included 3 Check all parts are included Contact Barrier Group immediately if you are missing a piece AFTER INSTALLATION CARE Barrier Group recommends that you check the operation of your gate at least every six mont...

Отзывы: