Roofing Products Division
605 Stonehill Drive SW, Atlanta, Georgia 30336
800-241-1806 • 404-344-0000 • www.tiedown.com
ISO 9001:2015 Certification
Intellectual property of TIE DOWN Inc. ©2018 TIE DOWN, Inc.
Instruction #08323 (E1683 Rev. 1/10/20)
Step 6
Repeat Step 5 for the opposite side bolt
assembly. Once both bolts are installed,
tighten both nuts.
Step 7
Repeat Steps 5 & 6 for the remaining
guardrail bracket.
NOTE
When not in use, secure the handle in
in the up position. Use the pull pin to lock the
handle. Secure the pull pin with the safety clip.
Tranzcart Assembly
Pull Pin
Safety
Clip