TACC-IIa
Installation and Start-up
Страница 1: ...TACC IIa Installation and Start up...
Страница 2: ...Cabinet construction thick 6 350 mm welded steel Door construction 3 8 thick 9 525 mm steel Anchors Tidel recommends using the supplied drop in anchor kit Tidel P N 00050103 to secure the unit to conc...
Страница 3: ...Access keys there is an alumi num tag with a key code stamped on it Keep these key codes in a safe place Without the key codes replacement keys cannot be made Check all keys for t and function Turn th...
Страница 4: ...e locked position door locking bar extended Step 2 Just above the door locking bar remove the phillips head screw and the mylar disable strip The door bolt key should not operate now Step 3 Turn the M...