![TIANJIN BAILI ERTONG MACHINERY QBR3 Скачать руководство пользователя страница 4](http://html.mh-extra.com/html/tianjin-baili-ertong-machinery/qbr3/qbr3_operation-manual_1114085004.webp)
2
actuator’s electrical control on site.
1.4 Mounting position of the electric actuator
2.
Electrical wiring
For user’s convenient, please see the attached documents for Electrical Schematic Diagram, Wiring
contacts table and Electric components table.
2.1 Electric wiring steps for the General type of actuator (non-explosion proof )
2.1.1 First, open the case cover; put power cable and control cable respectively through “wiring inlet
structure” and into the control case. Please see Fig.3 for wiring inlet structure.
2.1.2 According to the Electric schematic diagram, Terminal Numbers and Electric Schematic Wiring’s
number, connect each core wire with terminals . It should be reliable and cannot be exposed to the outside.
2.1.3 Gently pull the cable out so as to ensure that the cable will not influence other working parts in the
control case.
2.1.4 Put the sealing ring and gasket into the case’s screw hole; rotate gland nut and compress sealing ring,
so as to make it closely contact with cable’s edge.
2.1.5 Inner grounding and external grounding should be fixed and reliable.
2.2 Wiring steps for explosion-proof type of electric actuator (see Fig.4)
2.2.1 Remove No.1 gland nut, and take No.2-No.4. Now, No.3 gasket used for sealing is useless.
2.2.2 Open No.5 wiring box case.
2.2.3 Put power cable and control cable respectively through No.1, No.2, No.4 and No.2 (see Fig.4)
2.2.4 Put cable’s end into wiring box’s inlet hole; put the lug plate on each core wire; lug plate and the core
wire should be fastened.
2.2.5 Connect each core wire with corresponding contacts according to the electric schematic wiring
diagram.
2.2.6 Push every component on the cable into the wiring box’s inlet hole and gently pull the cable outward,