Thuraya Atlas IP and Atlas IP+
© 2017 Addvalue Innovation Pte Ltd. All rights reserved.
2
1.
Connect the antenna cable to ADU properly
without kinking it. Ensure that there is a rubber
gasket between ADU’s base and the mounting
surface of the pole mount or mast.
2.
Secure ADU to the pole mount or the mast by
using M6 x 25mm screws and the flat washers.
Below Deck Unit (BDU) Installation
Secure ADU to the pole mount or mast by
using M6 x 25mm screws and flat washers.
2.
Secure the left
mounting bracket
using two M5 x
12mm Self-Tapping
screws.
3.
Secure the right
mounting bracket
using two M5 x
12mm Self-
Tapping screws.
4.
On the BDU’s front panel,
connect and secure the DC
power cable, the antenna
cable and the primary
handset cable.
1.
Place BDU onto the
desired installation
area.
Above Deck Unit (ADU) Installation
Terminal Simplified Block Diagram
*Only for ALTAS IP+