LDC450B
Large Diameter Cleaver
Chapter 4: Setup
Page 10
TTN197399-D02
4.3.
Performing the First Cleave
When the status LED is steady green, the unit is ready to perform a cleave. Ensure that the proper inserts are in
place, ensure that the correct parameters have been loaded, and ensure you have stripped and cleaned the fiber
properly.
Place the fiber into the left fiber holding block v-groove, close the lid, and lift the lever so that the lid closes
completely. Make sure the stripped end of the fiber is sitting fully in the right v-groove, close the lid, and lift the
lever. Press the start button.
The LED will start flashing orange indicating that the unit is performing a process. The unit will apply tension to the
fiber, and when the target tension is reached, the cleave blade assembly will start oscillating until it touches the
fiber and performs the cleave. The left fiber holding block will move to the designated pullback position (if it is
engaged) and the LED will flash green indicating that the process has finished. Press down on the left lever, open
the lid, and remove the fiber. Press down on the right lever, open the lid, and remove the fiber remnant from the
right fiber holding block. Press the start button to return the nest to the correct initial starting position.
4.4.
Shut-down
To turn the unit off, press the silver button for five seconds. All of the indicator lights will go dark.
Содержание vytran LDC450B
Страница 1: ...LDC450B Large Diameter Fiber Cleaver User Guide...
Страница 2: ......
Страница 56: ...LDC450B Large Diameter Cleaver Chapter 13 CE Certificate Page 52 TTN197399 D02 Chapter 13 CE Certificate...
Страница 58: ...www thorlabs com...