![THORLABS OCT-LK2(-BB) Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/thorlabs/oct-lk2-bb/oct-lk2-bb_user-manual_1110881010.webp)
OCTG Series Scanner
Chapter 4: Installation
Page 6
MTN004419-D02
4.2.
OCTG Connections
4.2.1. Connecting the Electrical Control Interface
Attach the included electrical control cable to the OCTG. You may use either side of the cable since the plugs
are identical. The OCT scanner
’s electrical control interface is located at the top of the OCTG base module.
Align the red dot of the plug to the alignment mark of the port.
Push the connector into the receptacle unti
l a “click” sound is heard. This click indicates that the connector is
locked.
Figure 2 Installation of the Control Cable Connector at the OCTG
The remaining plug of the electrical control cable will be attached to the OCT base unit. Make sure that the
base unit is switched off.
The connection is located at the rear of the base unit. For installation, align the red dot, facing the alignment
mark in the base unit. Push the connector into the receptacle
marked “Control” until a “click” sound is heard.
This click indicates that the connector is locked.
Содержание OCT-LK2(-BB)
Страница 2: ...Original User Manual not translated...
Страница 4: ...Chapter 12 Thorlabs Worldwide Contacts 27...
Страница 32: ...M0009 510 885 D www thorlabs com...