Liquid Chiller
Rev A, December 6, 2019
Page 19
Chapter 6 Maintenance
6.1. Fuse Replacement
The fuse is located in the fuse drawer below the power inlet (B1 in Figure 1). To replace the fuse, press the two
clips on the drawer and pull it out.
Take out the used fuse and put in the new one. Please use Ø5 mm x 20 mm, 10 A, 250 VAC, Type "F", fast
blow fuse only.
6.2. Draining The Reservoir
The reservoir of the LK220 needs to be drained before shipping the chiller.
Before draining, open the hatch and remove the cap on the reservoir. Connect a small length of open tube on
both the “coolant In” and “coolant out”. Slightly lift the front side the chiller and wait until all coolant flows out
from the open end of the tubes.
Figure 11 Draining the Reservoir
Содержание LK220
Страница 1: ...LK220 Thermoelectric Liquid Chiller User Guide ...
Страница 2: ......
Страница 25: ...Liquid Chiller Page 22 CTN014239 D02 Chapter 8 Mechanical Drawings Figure 14 LK220 Diagram ...
Страница 26: ...Liquid Chiller Rev A December 6 2019 Page 23 Chapter 9 Certification and Compliance ...
Страница 27: ...Liquid Chiller Page 24 CTN014239 D02 ...
Страница 30: ...www thorlabs com ...