THOR GL165-N Скачать руководство пользователя страница 9

Thor Fryer Manual 12082014 

Page 9 

 

Installation 
 

 

 

 

 

 

 

 

 

     

CAUTION

 

 

THIS  APPLIANCE  AND  ITS  INDIVIDUAL  COMBINATION  GAS  VALVE  MUST  BE  DISCONNECTED 

FROM  THE  GAS  SUPPLY  PIPING  SYSTEM  DURING  ANY  PRESSURE  TESTING  OF  THAT SYSTEM  

AT TEST PRESSURES IN EXCESS OF 14”WC (1/2 PSIG or 3.45kPa). 

 

If the incoming gas pressure is in excess of 14"WC (1/2PSI, 3.45kPa), a proper 

step-down regulator will be required. 

 

 
Connect the gas supply directly to the 3/4"male BSP connector located near the lower left rear corner of 

the fryer. When tightening the supply pipe, be sure to hold the mating connector extending from the unit 

securely with a wrench. This will prevent any damage or distortion to the internal piping and controls of 

the unit. 

 

After connecting the gas supply, check again that the fryer is level. Use along spirit level four ways; 

across the front and rear of the fryer pot, and along each edge. 

 

Commissioning

 

1. 

Before leaving the new installation; 

a. Check the following functions in accordance with the operating instructions specified in the 

‘Operation’ section of this manual. 

•  Light the Pilot Burner. 
•  Light the Main Burner. 
•  Turning 'Off' the Main Burner/Pilot. 

 

b. Ensure that the operator has been instructed in the areas of correct lighting, operation, 

and shutdown procedure for the appliance. 

 

2. 

This manual must be kept by the owner for future reference and a record of the Date of Purchase, 

Date of Installation and the Serial Number of the Appliance must be recorded and kept with this 

manual. (These details can be found on the Rating label, refer to the ‘Gas Connection’ section). 

 

NOTE:  If for some reason it is not possible to get the appliance to operate correctly, shut off the gas 

supply and contact the supplier of this appliance. 

 

 

Install the Regulator 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание GL165-N

Страница 1: ...vapors or liquids in the vicinity of this or any other appliances Keep the area free and clear of combustible materials WARNING Improper installation adjustment alteration service or maintenance can c...

Страница 2: ...s Unpacking Location Clearances Assembly Gas Connection Commissioning Operation 10 Operation Guide Filling the Fryer Pot Shutdown Procedure Relighting Automatic Pilot Valve High Limit Control Cleaning...

Страница 3: ...READ THE INSTALLATION OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS APPLIANCE WARNING INSTRUCTIONS TO BE FOLLOWED INTHE EVENT THE USER SMELLS GAS ARE TO BE POST...

Страница 4: ...t Chain Gas Supply Requirements Natural Gas G20 Propane G31 Butane G30 GL165 N GL166 N GL165 P GL166 P GL165 P GL166 P Single burner Heat Input 8 8 KW 8 8 KW 8 8 KW 8 8 KW 8 8 KW 8 8 KW Heat Total 26...

Страница 5: ...Thor Fryer Manual 12082014 Page 5 Dimensions GL165 P GL165 N GL166 P GL166 N...

Страница 6: ...e only to be adjusted by an authorized service agent They are not to be adjusted by the installation person Unpacking Remove all packaging and transit protection from the appliance including all prote...

Страница 7: ...250mm 0mm 0mm Assembly NOTE This appliance is assembled before delivery except castors This appliance is fitted with adjustable castors to enable the appliance to be positioned securely and level Thi...

Страница 8: ...t the volume of gas necessary for satisfactory performance A combination gas valve and pressure regulator which is provided with each unit is set to maintain a 1 0kPa manifold pressure for natural gas...

Страница 9: ...er is level Use along spirit level four ways across the front and rear of the fryer pot and along each edge Commissioning 1 Before leaving the new installation a Check the following functions in accor...

Страница 10: ...g procedure and keep the ignition button down longer Adjustment of pilot flame may be necessary 4 When the pilot stays lit turn the knob counter clockwise to the temperature required Do not press down...

Страница 11: ...elted Additional solid shortening can then be added until the desired frying depth has been reached 8 Replace the basket support frame over the fryer pot heat tubes Shutdown Procedure Standby Turn the...

Страница 12: ...THIS SPACE All burners are lit from constantly burning pilots Turning the valve to the desired flame height is all that is required to put the unit in service Do not permit fans to blow directly at t...

Страница 13: ...support frame if applicable and flush out any sediment remaining in the fryer pot with a little hot oil 4 Wipe off the basket support frame and the inside of the fryer pot with a clean cloth CAUTION...

Страница 14: ...bove procedure can usually be removed by rubbing the surface with SCOTCH BRITE scouring pads or STAINLESS scouring pads DO NOT USE ORDINARY STEEL WOOL as any particles left on the surface will rust an...

Страница 15: ...ce dependable advice or other assistance and for genuine factory parts All units are adjusted at the factory In case of problems in operation at initial installation check type of gas and manifold pre...

Страница 16: ...ontrol unit is faulty Hold knob in for at least 20 seconds following ignition of the pilot Clean or replace the pilot injector Tighten the thermocouple connection Check that the thermocouple is produc...

Страница 17: ...Explosion drawing GL165 P GL165 N GL166 P GL166 N Thor Fryer Manual 01112013 Page 17...

Страница 18: ...1068571 1 7 Basket GL165 P GL165 N GL166 P GL166 N 01 10 1061027 2 8 Flue Rear GL165 P GL165 N GL166 P GL166 N 01 15 1066336 01 15 1066411 1 9 Fryer Restraint Chain GL165 P GL166 P GL165 N GL166 N 06...

Страница 19: ......

Страница 20: ...V1 Rev2 12 14...

Отзывы: