EN
16
d - iNSTALLATiON
20Nm drive kit
for rolliNg shutters aNd bliNds
2 - INSTALLING THE MANAGEMENT MODULE
The management module can be placed in a suitable recess-mount housing or junction box, or in the
shutter housing if there is sufficient space.
Ensure that the module cannot become trapped in any moving parts.
3 - CONNECTING THE MANAGEMENT MODULE
WARNING: all wiring must take place when the system is isolated (circuit breaker set to 'OFF').
35
M
3
5
Notes:
• How the raising and lowering phases (brown and black wires) are assigned is not important as if they
are inverted, this can be corrected after the wiring is complete.
• The white wire is not used: you can cut it off or insulate it with insulating tape.
• Do not extend the motor cable.
Raising phase
Lowering phase
motor
Earth
P
N
Содержание 500013
Страница 1: ...EN 20Nm drive kit for rolling shutters and blinds ref 500013 45Kg 3m www thomsonbox eu v2 ...
Страница 4: ......
Страница 13: ...13 EN D INSTALLATION Attach the anchor plate 20Nm drive kit for rolling shutters and blinds ...
Страница 25: ......
Страница 26: ......
Страница 27: ......