7
The two longer pipes should be connected to the other two brackets. On the other
end of the pipes, you connect the rack clamps.
After setting everything up, it should look like this here:
Now you can connect the rack clamps
onto the vertical pipes of the rack, just
as shown on the picture here.
.
The tom pads and the snare pad are simply put onto the L-rods of the rack.
Now, the set should look like this here: