background image

2.

M16, 20, 25, 30

ATTENTION INSTALLERS:

Changes are made periodically to the installation procedure to comply with engineering changes. To

ensure proper liftgate operation, it is 

VERY IMPORTANT

to read and understand the installation

instructions before attempting an installation. Installers also 

MUST

read and understand the liftgate’s

Owner’s Manual before installing the liftgate, so they can operate the liftgate safely as required during

different stages of the installation process. 

NEVER

perform a modification on the liftgate, which is not

specifically covered in the manual or which is unauthorized by Thieman. Modifications may result in

failure of the liftgate and may create hazards for liftgate installers, operators, or maintainers. Serious

damage, equipment failure, or operator injury could result from improper installation. This equipment

MUST

have all decals applied properly. 

FAILURE

to apply all decals properly will 

VOID

all warranties!

Any installer with questions or doubts should contact Thieman before proceeding.
The M, MLB, MDC, and MDCLB are stow-away style liftgates for use on trucks and trailers. Before

mounting your liftgate, make sure that the model you have will work on the truck or trailer you intend to

mount it on. The loaded and unloaded bed height of your truck (with weight of liftgate figured in) 

MUST

fall within the bed height range of your liftgate. To determine the bed height range of your liftgate, you

must know the full model name, the platform material of both the main section and extension (i.e. both

steel, both aluminum, or steel main with aluminum extension), and the platform size (see charts and fig-

ures on pages 2 thru 4).

NOTES:

1. The tip of the platform will touch the ground on standard STOW-AWAY liftgates, but not on gates

designed for “level ride”. “Ramp ride” is standard, “level ride” is built for special order only.

2. Reference figures 1 and 2 for charted dimensions on pages 2 thru 4.

3. All maximum mounting dimensions are shown with the vehicle empty; all minimum mounting dimen-

sions are shown with the vehicle loaded.

4. Check bed height “H” when parked on a level surface.

5. Check “C” dimension for possible interference with spring hanger bracket before installation.

6. If the liftgate was ordered with the optional 216 receiver kit, use the loaded bed height (Hmin) to

determine what set of mounting dimensions to use. Bed height range for 216 Kit is 42" min. (vehicle

fully loaded) and 54" max. (vehicle empty).

ALL STEEL PLATFORMS (STEEL MAIN AND EXTENSION)

Platform Size

Models                  H               A               B              C                D                E

32+5

All Models           34"-40"       16.50         14.00        32.00           4.00          5.50

38W

MLB 16/20           34"-40"       16.50         14.00        32.00           4.00          5.50

36+6

M 16/20          37"-44.99"     19.50         17.00        30.50           5.00          8.00

                   45"-50"       22.00         16.00        28.50           5.50        10.00

                   50"-54"       25.00         15.00        25.50           6.50        13.00

36+6

M 25/30          38"-44.99"     19.50         17.00        30.50           5.00          8.00

                   45"-50"       22.00         16.00        28.50           5.50        10.00

                   50"-54"       25.00         15.00        25.50           6.50        13.00

42+6

All Models           42"-45"       19.50         18.50        30.50           5.00          8.00

                   45"-50"       22.00         17.50        28.50           5.50        10.00

                   50"-54"       25.00         16.50        25.50           6.50        13.00

42+10 RET

M 16/20             37"-45"       19.50         17.00        30.50           4.19          6.00

                   45"-50"       22.00         16.50        28.50           4.75          8.00

                   50"-54"       25.00         16.00        25.50           5.50        11.00

42+10 RET

M/MDC 25/30        38"-45"       19.50         17.00        30.50           4.19          6.00

                   45"-50"       22.00         16.50        28.50           4.75          8.00

                   50"-54"       25.00         16.00        25.50           5.50        11.00

42W

All Models           45"-50"       22.00         16.00        28.50           5.50        10.00

                   50"-54"       25.00         15.00        25.50           6.50        13.00

Содержание MDC LB

Страница 1: ...READ AND UNDERSTAND THE CONTENTS OF THIS MANUAL BEFORE OPERATING THE EQUIPMENT TAILGATES INC 600 East Wayne Street Celina Ohio 45822 Phone 419 586 7727 Fax 419 586 9724 www thiemantailgates com HIEMAN...

Страница 2: ...or steel main with aluminum extension and the platform size see charts and fig ures on pages 2 thru 4 NOTES 1 The tip of the platform will touch the ground on standard STOW AWAY liftgates but not on...

Страница 3: ...16 20 34 40 16 50 13 00 32 00 4 50 5 50 36 6 M16 20 37 44 99 19 50 18 00 30 50 5 00 8 00 45 50 22 00 17 00 28 50 5 50 10 00 50 54 25 00 16 00 25 75 6 50 13 00 36 6 MDC M25 30 38 44 99 19 50 19 00 30 5...

Страница 4: ...move banding from gate undercarriage Inspect for obvious shipping damage or missing parts Step 2 If necessary notch rear of body as shown in figure 2 Step 3 Center and level spacer at rear of body and...

Страница 5: ...this time the M series liftgates are pre assembled with cylinder and pump mounted On certain installations for instance a truck with a rear fuel tank the pump may get in the way of obtaining the prope...

Страница 6: ...equipment such as a lengthened van body rebuilt trailer or other altered vehicle where the underframe stops short of the end of the vehicle body frame extra support must be added to avoid any indepen...

Страница 7: ...ssis Where this is the case the factory installed cable does not provide an adequate ground circuit for operating bat tery powered liftgates We recommend that the cables labeled with an X be not less...

Страница 8: ...ower Down liftgates the rod end port on cylinder must be plumbed to C1 port on pump note Incorrectly plumbing rod end port on cylinder to C2 port will make gate drift down and motor to spin backwards...

Страница 9: ...9...

Страница 10: ...form for stowing and raise until the tension is relieved from spring item C 2 Remove snap ring item A from the groove and slide it to the left 3 Remove the locknut item G from item E 4 Slide spring su...

Страница 11: ...11 Step 14 After installation is complete lower platform to the ground and if a sag is present between the platform and main section a shim must be added as shown in figure 17...

Страница 12: ...weight centrally located on the platform A minimum of 20 cycles should be made to insure the integrity of the mounting Step 17 Finish paint as required and remove the pre mask on decals already applie...

Страница 13: ...0 5 Capacity Decal 2000 4650100 5 Capacity Decal 2500 4650110 5 Capacity Decal 3000 4650120 6 Warning Decal pinch point 4604 7 Handle Decal 4605 8 Thieman nameplate not shown 4650800 9 Urgent Warning...

Страница 14: ...14...

Страница 15: ...15...

Страница 16: ...Rev 12 17 5C MP94438...

Отзывы: