![THERMOROSSI BOSKY 25 Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/thermorossi/bosky-25/bosky-25_installation-user-and-service-manual_1106083035.webp)
4.
3 WIRING DIAGRAM 25 - 30
The electrical connections must be made before mounting the left side panel as the terminal
block is located behind the left side panel (see the figure below on the right).
CAUTION: IT IS MANDATORY TO EARTH THE CENTRAL HEATING COOKER AS
ILLUSTRATED IN THE BELOW DIAGRAM. IF THIS INSTRUCTION IS NOT OBSERVED
SERIOUS DAMAGE, WHICH IS NOT COVERED BY WARRANTY, WILL RESULT TO THE
BODY OF THE CENTRAL HEATING COOKER. HAVE AN ELECTRICIAN CHECK THE
EARTHING. THERE MUST BE NO ELECTRIC POTENTIAL (VOLTS) BETWEEN THE EARTH OF
THE CENTRAL HEATING COOKER
EARTH AND THE ACTUAL EARTH OF THE PLANT.
BELOW IS THE AUTOMATIC AIR CONTROL UNIT
Содержание BOSKY 25
Страница 21: ...2 TECHNICAL CHARACTERISTICS ...
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 39: ......
Страница 41: ......
Страница 42: ...4 8 GUIDELINES FOR THE HYDRAULIC CONNECTIONS OF THE CENTRAL HEATING COOKER TO THE AIR CASED BOILER ...
Страница 45: ......
Страница 56: ...Fig 1 ...
Страница 57: ......
Страница 58: ...FIG 2 Single Story Instalations INTERNAL ...
Страница 63: ...9 SPARE PARTS 9 1 SPARE PARTS FOR BOSKY 25 30 PART 1 ...
Страница 64: ......
Страница 65: ......
Страница 66: ...pg 23 ...
Страница 67: ...pg 67 ...
Страница 68: ......
Страница 69: ...pg 69 ...
Страница 70: ......
Страница 71: ...pg 71 ...
Страница 72: ......
Страница 73: ...pg 73 ...
Страница 74: ......
Страница 75: ...pg 75 ...