4
To fit all three wall bracket tubes to the nuts on the back of the towel rail,
partially undo the grub screw in each stainless steel tube using the allan key
provided (Fig.1). Drop the anchor bush out of the tube (Fig.2). Using a flat
head screwdriver, attach the bracket tube to the nut taking care not to over-
tighten the set screw. Ensure that the hole for the grub screw is facing down,
out of normal view (Fig.3).
If the electrical connection is to be in a standard round junction box, place
the metal disc of the element cover onto the plastic wall plate. Align the
holes in the disc to those of the junction box and using the two 5mm x
40mm machine screws, attach the metal disc and plastic plate to the
junction box. Should the electrical connection wires exit directly from a
conduit, guide the wiring through the centre of the metal disc and mark the
two holes on the wall for drilling.
Ensure that the rail is straight and level before carefully marking the outside
circumference of the three tubes against the wall. Remove the rail from the
wall. In order to avoid a hazard for very young children, this appliance should
be installed so that the lowest heated towel rail is at least 600mm above
the floor.
Place the centre finder within the pencilled circle and mark the centre spot
for drilling. Drill the holes to the correct depth using a 6mm masonry drill
and insert the plastic wall plugs. Attach the 3 anchor bushes firmly to the
wall using the 10 x 50 fixing screws.
Installation Steps
Fig.1
Fig.2
Fig.3
The Thermorail models in this guide need to be hard wired and the wiring is
supplied connected at the bottom right.
Fig. 1
Fig. 2
Fig. 3
Содержание S60SAB
Страница 10: ...10 Notes ...
Страница 11: ...11 Contact us Notes ...
Страница 12: ...12 sales thermogroup com au www thermogroup com au 1300 368 631 Contact Us ...