assembly, request a demonstration of the boiler operation and have operators trained by a professional from the 

assembly company. After commissioning, the authorized service technician shall confirm the warranty card for 

the electric boiler. 

For the electric boiler installation, there needs to be pressured water available on site in order to fill the 

system. 

 

Location of the boiler 

The electric boiler may be installed in the basic AA5/AB5 environment according to CSN 2000-3 and CSN 

33-2000-5:51 ed.3 (temperature range from +5 to 40°C, 

humidity depending on the temperature up to max. 85%, 

without harmful chemical effects). Suitable for 

installation in both residential and non-residential 

premises. The boiler shall not be installed in areas with a 

bath, in bathrooms, shower rooms in zones 0, 1  and 2 

according to CSN 33 2000-7-701 ed.2:2007 and in wash 

rooms according to CSN 33 2130 ed.2:2009. In addition 

to that, it shall not be installed in zone 3 either if there is 

a chance that a jet of water intended for cleaning might 

be present. When the boiler is installed in permissible 

zones, appropriate protection from electric shock needs 

to be ensured according to the aforementioned standard. 

There shall be necessary access for operation and service purposes on the installation site.  

 

 

Suspending the boiler 

The electric boiler shall be mounted to a wall using 

the suspension bar, wall plugs and screws included 

in the delivery. For ideal suspension, the room 

needs to have a flat wall with a sufficient load-

bearing capacity. Direct suspension e.g. from 

plasterboard structures is not recommended. In case 

of installation on a wall with a lower load-bearing 

capacity, it is recommended that a construction technician 

be consulted. Under the bottom edge of the boiler and 

above the upper edge of the casing, a service space of at 

least 200mm and 750mm, respectively, needs to be 

maintained for the purposes of inspection or replacement of 

the heating bodies.  

Содержание THERM ELN 15

Страница 1: ...09 2015 Installation operation and maintenance manual for electric boilers User s Manual Version September 2015 THERM ELN 8 THERM ELN 15...

Страница 2: ...ONING 13 9 GRAPH OF CONNECTING OVER PRESSURE VALUES OF HEATING WATER THAT CAN BE APPLIED 15 10 EL CONNECTION OF THERM ELN BOILERS 16 11 WARRANTY AND RELIABILITY FOR DEFECTS 18 12 INTERCONNECTION WITH...

Страница 3: ...e boiler but is part of the el switchboard for the given flat or house During installation of the electric boiler there needs to be sufficiently dimensioned main contactor or switch properly marked co...

Страница 4: ...ce error messages Possibility to set selected boiler parameters service menu Brief description of the main advantages of the THERM ELN electric boiler Easy and intuitive control The control system is...

Страница 5: ...s under uniform thermal load if possible and the rods are under uniform operating load Switching system of the boiler by HDO The THERM ELN boiler signals and responds to commands from the HDO receiver...

Страница 6: ...plicant needs to request a preliminary approval with the potential connection of higher input power and request the relevant rate If new central heating is constructed or an old one reconstructed we r...

Страница 7: ...33 2130 ed 2 2009 In addition to that it shall not be installed in zone 3 either if there is a chance that a jet of water intended for cleaning might be present When the boiler is installed in permiss...

Страница 8: ...e boiler installation and commissioning shall be appropriately recorded in the warranty card No interventions with the internal wiring of the boiler unless otherwise mentioned in this manual e g conne...

Страница 9: ...d in the following wiring diagrams The THERM ELN boiler is able to control its output automatically It is fitted with its own PID regulation which prevents the boiler from overheating beyond the tempe...

Страница 10: ...O receiver is a device which carries out the required switching operation e g blocks unblocks the appliance based on the evaluated HDO signal Evaluating the HDO signal The automatic system is factory...

Страница 11: ...heating water temperature pressure in the system instantaneous power failure number The parameter to be displayed is selected by pressing the SELECT button in the middle The parameter which is current...

Страница 12: ...erature control with analogue control voltage at the Ui input is set You can change the data on the display with the arrow keys When the C LED indicator is flashing it indicates the mode in which the...

Страница 13: ...nected and one level of output will be switched on The heating operation will stop as soon as the output water temperature exceeds 15 C If the lower limit of the required heating water temperature is...

Страница 14: ...ion When the display is on there is control mains voltage in the boiler Set the room thermostat or another external control to the required temperature Press the arrow up key to display the current he...

Страница 15: ...ng system The outer casing can be cleaned e g with a cloth soaked in soap water and wiped dry Putting the boiler out of operation The boiler can be turned off for a shorter period of time by pressing...

Страница 16: ...16 10 Electrical connection of THERM ELN boilers Electrical connection of THERM ELN 8 boilers STORAGE TANK HEATING MODULE STORAGE TANK HEATING MODULE...

Страница 17: ...17 Electrical connection of THERM ELN 15 boilers STORAGE TANK HEATING MODULE STORAGE TANK HEATING MODULE...

Страница 18: ...epair costs by the customer THERMONA spol s r o provides a warranty on its products in accordance with the terms and conditions specified in the warranty card delivered with the product Conditions for...

Страница 19: ...tor and supply terminals Connection of the DHW module and servicing of the electrical system of the boiler may only be carried out by authorized service companies The storage tank is heated by automat...

Страница 20: ...ted control system 9 Heating rod 10 Emergency thermostat and temperature sensor pocket 11 Vent valve 15 THERM ELN 15 boiler set 1 Boiler frame 2 Emergency thermostat the sensor is situated in the pock...

Страница 21: ...21 16 Dimensions and connections 1 Return water inlet male thread 2 Safety valve outlet 3 Return water outlet male thread 4 Inlet for the system recharge male thread 5 Supply cable grommet...

Страница 22: ...aging shall be disposed of in paper waste collection points wrapping film shall be discarded in recycling bins intended for plastics Parts of the boiler made of steel copper and copper alloys shall be...

Страница 23: ...d recommendations When used under conditions recommended by the manufacturer its operation is safe Measures have been taken to ensure compliance of this appliance being launched to the market with tec...

Отзывы: