Additional functions  

 

The pump starts running regularly when not operational (it runs for 3 minutes after 24 hours of 
inactivity). 

 

Antifreeze  protection  is  activated  when  the  temperature  in  the  boiler  falls  bellow  8 

o

C.  I.e.  the 

pump starts running, the boiler ignites and it heats the circuit up to 35 

o

C. When this temperature 

is reached, it switches off. 

 

A re-check of a through-flow switch is activated if the pump runs for 15 seconds and the through-
flow switch does not work. The pump stops and after 45 seconds another attempt at switching the 
boiler on is made. This is repeated 10x. After this the boiler has to be switched off and on by the 
mode switch. If the pump was inactive for more than 30 minutes before another boiler switch-on, 
the first interval of the pump is 180 seconds.  

 
 
The  accredited  service  technician  is  bound  to  inform  the  user  about  the  correct  use  of  the 

boiler,  about  its  parts  and  safety  elements,  to  fill  in  the  guarantee  sheet  and  to  give  the  user  this 
manual.  

The user has to use the boiler only in the ways described in this manual. This is also the condition 

for guarantee. The user is strictly forbidden to change or interfere with the fixed parts of the boiler!

 

 
 

13.

 

 GUARANTEE AND LIABILITY FOR DEFECTS     

 

The  manufacturer  is  not  to  be  held  liable  for  any  mechanical  damage  of  individual  components 

caused by malpractice, for defects caused by unprofessional handling with the electronics while adjusting 
or  adding  extension  regulations,  or  for  defects  caused  by  using  other  parts  and  components  than  the 
original ones used by the manufacturer.  

 
Further,  the  guarantee  does  not  cover  any  defects  caused  by  breaking  the  important  notes  and 

conditions stated in individual paragraphs of this manual for installation and maintenance.  

 
The guarantee does not either cover situations caused by non-standard conditions in the distribution 

network  (voltage  fluctuation  and  overvoltage  peaks,  gas  pressure  and  purity  etc.),  defects  of  appliances 
outside  the  boiler,  which  influence  its  function,  wrong  flue  exhaust,  impurities  in  the  combusted  air, 
damage caused by external influence, mechanical damage, storing, transport and defects caused by natural 
disasters.  

 
In these cases the service company may also require the customer to pay for the repairs. 

 
 

Conditions for guarantee application: 
 

1)

 

The maintenance check of the boiler must be carried out 1x a year. It may be done by an 
authorized company bound by contract. 

2)

 

All guarantee repairs and yearly maintenance checks must be recorded on the appendix of this 
manual and it must be submitted. 

 
 
 
 
 
 
 
 
 
 
 
 

Содержание Therm DUO 50 FT

Страница 1: ...Manual for installation and maintenance DUO 50 FT...

Страница 2: ...ents 7 Starting the boiler 7 Disconnecting the boiler 8 6 Regulations for control and maintenance 8 Use of the boiler 8 LCD display 9 Maintenance 10 7 Gas fitting SIT 845 SIGMA 10 8 Boiler hanging 11...

Страница 3: ...removable Above the exchangers there is an exhaust rectifier There is an eighteen armed water cooled low NOX gas burner in the lower part of the combustion chamber The burner is a product of POLIDORO...

Страница 4: ...rough which the combustion air will be supplied and another through which the flue gas will be exhausted 3 TECHNICAL SPECIFICATIONS units DUO 50 FT Flue natural gas Boiler category I2H Maximum heat in...

Страница 5: ...g must follow valid technical regulations Important No flammable objects can be placed within the safe distance from the boiler i e 50 mm and within the safe distance from the exhaust pipe and check g...

Страница 6: ...combustion air will be supplied and another through which the flue gas will be exhausted Given the wide range of possible solutions the exhaust components are not delivered as the standard boiler fix...

Страница 7: ...ilers and features of IU 02Q interface communication with programmable QAA 73 110 This kind of communication offers more programmable options and it displays the operational modes of the boiler room m...

Страница 8: ...for user s setting of water temperature in the heating system within 35 80o C the recommended range is 55 80o C If weather compensated regulation is used you can set the heating curve within 15 C from...

Страница 9: ...gain Failure or operational values exceeding indication The LCD display shows E and failure code for codes see the following chart failure code meaning E01 ignition failure E02 insufficient heating wa...

Страница 10: ...erm is signalled by top arrows in the display corners when it is a communication of a cascade IU04 10 and IU05Q it is signalled by bottom arrows Maintenance Regular maintenance is very important for r...

Страница 11: ...e manual Important The system for the setting of gas pressure range on modulator is protected by a plastic cover That is removed for gas pressure setting and after the setting it is necessary to put i...

Страница 12: ...es of heating water are done for Wilo 25 70 and Grundfos 15 60 pumps at the highest level of regulation We do not recommend lowering the pump output because of the boiler output and circulation featur...

Страница 13: ...Graphs for boiler output setting Graph for output settings of THERM DUO 50 FT natural gas nozzles 1mm 0 2 4 6 8 10 12 14 25 27 29 31 33 35 37 39 41 43 45 Boiler output kW Gas pressure mbar Starting o...

Страница 14: ...14 10 BOILER SETS 10 1 THERM DUO 50 FT set front view...

Страница 15: ...15 10 2 THERM DUO 50 FT set side and top view...

Страница 16: ...16 11 1 Wiring diagram of THERM DUO 50 FT connection...

Страница 17: ...e outlet heating water temperature exceeds the set temperature by 5 o C At this moment the boiler stops burning but the pump is running and the re ignition is restricted for some time the factory sett...

Страница 18: ...setting is to be set to a value a little higher than it is when a room thermostat is not used If the outside temperature sensor is not working the failure is signalled and the boiler works in the prev...

Страница 19: ...rts of the boiler 13 GUARANTEE AND LIABILITY FOR DEFECTS The manufacturer is not to be held liable for any mechanical damage of individual components caused by malpractice for defects caused by unprof...

Страница 20: ...sely to each other not further than 50 cm that they are exposed to the same climatic conditions C42 Separated connection to two pipelines within the same shaft The outlet of both shafts is either conc...

Страница 21: ...duction correspond with the requirements of valid norms and regulations The product packaging is to be handed in the paper disposal area the foil in the disposal containers for plastics The boiler par...

Страница 22: ...sic technical safety and hygienic requirements The product is certified by Engineering testing institute authorized person 202 THERM DUO 50 FT certificate for type testing according to EC guidelines f...

Отзывы: