Terminator
TM
ZE-B Beacon
LED End of Circuit Light Kit
INSTALLATION PROCEDURES
Страница 1: ...TerminatorTM ZE B Beacon LED End of Circuit Light Kit INSTALLATION PROCEDURES ...
Страница 2: ... limited to 275 VAC when wiring is done using the terminal block option 5 Minimum installation Temperature for terminators that use the wei dmuller terminals is 50 C TerminatorTM ZE B Beacon Item Quantity Description 1 1 Expediter Assembly Grommet Compressor Grommet Support Base with O Ring 2 1 Light Module Cover 3 1 Banding Guide 4 1 Banding 5 1 LED Light Module Order Separately SCTK Connection T...
Страница 3: ... in PETK 3 6 Cut off end of cable 7 Terminate cable with appropriate SCTK termination kit Refer to SCTK installation instructions Push excess cable back through expediter Remove braid pigtail Tape cable expansion loop to pipe 50 mm 2 Max 300 mm 12 Bus Connection Weep Hole 101 mm 4 Min 25 mm 1 Min Expediter Assembly Boot Wire Crimp Heating Cable Light Module Light Module Wiring Wiring Schematic for...
Страница 4: ...e Slide the light module cover over light module Light Module Cover Lens Expediter Assembly Light Module 9 Snap on crimp insulators Light Module Expediter Assembly Crimp Insulators 10 Slide silicone caps over crimp insulators Install Light Module to Expediter Silicone Cap TerminatorTM ZE B Beacon INSTALLATION PROCEDURES Locked Position Unlocked Position 14 Connect the bus wires of the trace heater...