1.
Locate bus connection (HPT and FP only) and
cable as shown. Cut end of cable at angle to aid
in piercing grommet. Leave additional cable for
expansion loop.
3.
Slide expediter toward pipe and route cable
through support base entry.
4.
Insert banding guide into expediter and snap
into place.
5.
Mount expediter to pipe using pipe band. Do
not band over cable.
2.
Insert cable into expediter. If mounted on
bottom of pipe, punch out weep hole.
Note: For HPT and FP cable, exchange grommet
in terminator with GR-G provided in PETK-3.
6.
Cut off end of cable.
7.
Terminate cable with appropriate SCTK
termination kit. Refer to SCTK installation
instructions. Push excess cable back through
expediter. Remove braid pigtail. Tape cable
expansion loop to pipe.
8.
When using wire connector:
Connect
bus wires using small wire nuts (for
BSX, HTSX and KSX) or medium wire
nuts (for RSX, VSX, VSX-HT, HPT and FP).
When using terminal block:
See steps 9–11.
See wiring schematic for connection details.
50 mm
(2")
Max.
300 mm
(12")
Bus
Connection
Weep
Hole
101 mm
(4") Min.
Do Not Band
Over Cable
Wiring Schematic for LED Light
Light Module
Expediter Assembly
Wire Connector
Expediter Assembly
Boot
LED Light Pigtail
Heating Cable
Min.
300 mm
(12")
INSTALLATION PROCEDURES