background image

Kit Contents 

Tools Required 

Receiving, Storing and Handling 

1.  Inspect materials for damage incurred during shipping.

2.  Report damages to the carrier for settlement.
3.  Identify parts against the packing list to ensure the proper 

type and quantity has been received.

4.  Store in a dry location.

Dimensions 

Terminator

TM

 DE-B Beacon

Item

Quantity

Description

1

1

Expediter Assembly

 

    Grommet Compressor 

    Grommet 

    Support Base with O-Ring

2

1

Light Module Cover

3

1

Banding Guide

4

1

Banding (fits 10" pipe and below) 

5

1

LED Light Module

210 mm

 

(8.25")

76 mm 

(3")

89 mm 

(3.5")

64 mm 

(2.5")

2

4

3

5

Order Separately 
SCTK Connection Termination Kits (per cable)

SCTK-1D

for BSX, RSX, VSX, VSX-HT

SCTK-2D

for KSX, HTSX

SCTK-3D

for FP, HPT

Order Separately 
SCTK Terminal Block Connection Kits (per cable)

SCTK-1TB

for BSX, RSX, VSX, VSX-HT

SCTK-2TB

for KSX, HTSX

SCTK-3TB

for FP, HPT

Item

Quantity

Description

1

2

Connection Boots

2

1

Large Wire Nut

3

2

Medium Wire Nuts

4

2

Small Wire Nuts

5

1

RTV Tube

6

1

GRW-G Grommet (SCTK-3D only)

Item

Quantity

Description

1

1

Terminal Block

2

1

Terminal Block Mounting Screw

3

1

Splice Connection Boot

4

1

RTV Tube

5

1

GRW-G Grommet (SCTK-3TB only)

6

1

IP66/Type 4X   -60°C ≤ Ta ≤ +45°C, T6

 

 

      -60°C ≤ Ta ≤ +55°C, T5 

 

Ordinary & Hazardous Locations
Class I, Division 2, Groups A, B, C, & D, Zone 2 IIC T6...T5
Class II, Division 2, Groups F & G, Class III

Certifications/Approvals  

Installation Precautions 

•  To minimize the potential for arcing and fire caused by product 

damage or improper installation use ground-fault protection. 

The National Electrical Code (NEC) and Canadian Electrical 

Code (CEC) require ground-fault protection of equipment for 

each branch circuit supplying electric heat tracing.

•  Installation  must  comply  with  Thermon  requirements  and 

be installed in accordance with the NEC, CEC, or any other 

applicable national and local codes.

•  Component approvals and performance ratings are based on 

the use of Thermon specified parts only. User supplied power 

connection fittings must be listed or certified for intended use.

•  De-energize all power sources before opening enclosure.
•  Keep ends of heating cable and kit components dry before and 

during installation.

•  Individuals  installing  these  products  are  responsible  for 

complying with all applicable safety and health guidelines. 

Proper  personal  protective  equipment,  or  PPE,  should  be 

utilized during installation. Contact Thermon if you have any 

additional questions.

1

2

4

3

5

2

4

3

5

1

Отзывы: