![ThermoFlow Elex Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/thermoflow/elex/elex_user-manual_1105641017.webp)
DE GB
16
This appliance should be earthed.
The connections are protected to IP 25 (jet-proof).
Final installation /
Commissioning
Final installation
Open the cold water stop valve.
•
Install the top of the housing.
•
Insert the fixing screw at the bottom.
•
Install the cladding and secure it with the screw. If the pipes are installed on the wall
•
then break the ports of the cladding out and fit the supplied entries.
Commissioning
Fill the unit and vent it by opening a hot water tap connected to it.
•
Only switch on the electrical supply once the cold air pipe and the heater are clear
•
of any air.
Check the operation of the instantaneous water heater.
•
Care and maintenance
Maintenance, e.g. verifying electrical safety, should only be undertaken by a qualified
electrician, observing the relevant regulations (IEEE, etc.).
The enclosure can simply be cleaned with a damp cloth. Do not use aggressive cleaners
or cleaners with a scouring effect!