3
Performing Injectors Routine Maintenance
Maintaining a Split/Splitless Injector (SSL)
Thermo Scientific
TRACE 1300 and TRACE 1310 Hardware Manual
83
Replacing the SSL Septum
To replace the septum
Figure 77.
SSL Injector: Septum Replacement
1. Put the GC in standby condition.
2. Cool the oven and injector to room temperature.
3. Turn the carrier gas off, and wait for the carrier pressure to go to zero.
4. Put the autosampler away if present.
5. Open the module flap cover.
6. Replace the septum.
a.
Unscrew and remove the septum cap.
Note
For maintaining or replacing any other component not listed in this section, see
Chapter 6, “Injectors Advanced Maintenance.”
•
“Baking-out Contaminants from SSL, SSLBKF, HeS-S/SL, PTV, and PTVBKF
Injectors”
•
“Removing/Replacing an Injector Module”
•
“Cleaning the SSL Injector Body”
Note
By pressing the
Maintenance
button, the GC cool down is automatically
carried out.
Septum Holder
Septum
Septum Cap
Содержание TRACE 1300
Страница 1: ...TRACE 1300 and TRACE 1310 Gas Chromatographs Hardware Manual PN 31715002 Revision F January 2016 ...
Страница 4: ......
Страница 16: ......
Страница 94: ......
Страница 224: ......
Страница 450: ......
Страница 578: ......
Страница 610: ......
Страница 620: ......
Страница 624: ......