3
Maintenance
Standard Analytical Flow Cell
Thermo Scientific
Surveyor UV/Vis Plus Detector Hardware Manual
33
Standard Analytical Flow Cell
To remove or install the standard analytical flow cell, follow these topics:
•
Removing the Standard Analytical Flow Cell Assembly
•
Installing the Standard Analytical Flow Cell
Removing the Standard Analytical Flow Cell Assembly
To clean or replace the standard analytical flow cell, remove it from the UV/Vis detector.
To remove the standard analytical flow cell
1. Turn the detector off and unplug the detector from line power.
2. Open the front doors of the detector.
The flow cell assembly is located behind the flow cell cover.
3. Remove the flow cell cover by unscrewing the flow cell cover retention screw and pulling
it straight out and away from the flow cell assembly. See
Figure 25.
Surveyor UV/Vis Plus Detector with the flow cell cover installed
CAUTION
Flow cells are factory-assembled units. Do not disassemble them.
CAUTION
To prevent possible exposure to UV light, turn the detector off and unplug
the power cord from the power receptacle on the back panel.
Standard analytical flow cell
cover retention screw
Содержание Surveyor UV Plus
Страница 1: ...Thermo Surveyor UV Vis Plus Detector Hardware Manual 60053 97108 Revision F December 2013...
Страница 16: ......
Страница 66: ......
Страница 76: ......