PRO902C MANUAL
T
FS
Rev 6.0
August 16, 2007
3-4
.5 In
1.0 In
MOUNTING GASKET
TOP CENTER
Figure 3.3
Probe Barrel Assembly
Probe head installation
NOTE:
Before initial installation of the dilution probe assembly, and after any probe head
maintenance, the tests described in Sections 4.9 and 4.10 of this manual should be performed. The
probe pre-test verifies that the probe assembly is leak free and has the proper flow rates.
A)
Reinstall the probe head by sliding the probe head over the polished probe tip. The rear of the
probe head is usually tilted upward during installation to allow clearance for the sample outlet
fitting.
B)
Reinstall all items removed during steps B and C of the probe head removal section:
1)
Connect the eductor dilution air.
2)
Connect the eductor exhaust tube.
Содержание PRO902C
Страница 6: ......