5 • AE Analyzer Enclosure Description
Doc. 065250-06 03/2020
75
additional locations only when the optional Computer Control Installation Kit
(P/N 069094) is installed.
A USB hub inside the AE connects the chromatography modules installed in the
AE to the network.
5.5
AE TTL and Relay Connectors (Option)
Two TTL and relay connectors are provided on the top of the AE (see
These connectors are functional only if the AE TTL and Relay Kit (P/N AAA-
068548) and the SP TTL and Relay Kit (P/N 068573) are installed.
For details about TTL and relay control, see
.
For installation instructions for the TTL and Relay Kits, see
Figure 5-7. Communication Connectors on Top of AE
USB Receptacles (2)
(Optional)
USB Receptacle
(Standard)
LAN Receptacle
(Optional)
2
3
1
3
2
4
TTL and Relay
Connectors (Optional)
4
1
5
USB Receptacle
(Optional)
5
Содержание Dionex
Страница 1: ...Dionex Integral Process Analytical Systems Operator s Manual Document No 065250 Revision 06 March 2020...
Страница 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Страница 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Страница 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Страница 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Страница 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Страница 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Страница 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Страница 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Страница 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Страница 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Страница 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...