Doc. 065250-06 03/2020
151
C • TTL and Relay Installation Instructions
This appendix contains installation instructions for the following optional kits and
components:
NOTE Installation of the SP TTL and Relay Kit is a
prerequisite for installation of any of the other options
listed above.
Part Number
Option
Description
068573
SP TTL and Relay Kit
Provides a controller board, connectors,
and cables for adding TTL and relay
control to the SP.
AAA-068548
AE TTL and Relay Kit
Provides connectors, cables, and
protective hoods for installing TTL and
relay connectors on the AE.
069071
069072
SP TTL Breakout Board
SP Relay Breakout Board
Provides interfaces for connecting the
connectors on the SP TTL/Relay
controller board to other devices.
068549
AE Tower Light Kit
Provides a tower of four LED lights to be
mounted on top of the AE enclosure.
Содержание Dionex
Страница 1: ...Dionex Integral Process Analytical Systems Operator s Manual Document No 065250 Revision 06 March 2020...
Страница 12: ...Dionex Integral Systems Operator s Manual x Doc 065250 06 03 2020...
Страница 17: ...1 Introduction Doc 065250 06 03 2020 5 Figure 1 2 Example Analyzer Configuration...
Страница 28: ...Dionex Integral Systems Operator s Manual 16 Doc 065250 06 03 2020...
Страница 72: ...Dionex Integral Systems Operator s Manual 60 Doc 065250 06 03 2020...
Страница 92: ...Dionex Integral Systems Operator s Manual 80 Doc 065250 06 03 2020...
Страница 96: ...Dionex Integral Systems Operator s Manual 84 Doc 065250 06 03 2020...
Страница 154: ...Dionex Integral Systems Operator s Manual 142 Doc 065250 06 03 2020...
Страница 160: ...Dionex Integral Systems Operator s Manual 148 Doc 065250 06 03 2020...
Страница 202: ...Dionex Integral Systems Operator s Manual 190 Doc 065250 06 03 2020...
Страница 214: ...Dionex Integral Systems Operator s Manual 202 Doc 065250 06 03 2020...
Страница 228: ...Dionex Integral Systems Operator s Manual Index 10 Doc 065250 06 03 2020...